Laserfiche WebLink
INSPECTION REPORT <br /> NV/ "-4 VE ro t•,t p/i i i i i i w7::. <br /> Dates (1 Permit: )1\11041 00/4 <br /> Contractor: Nick S:0NA <br /> Owner: ‘3 S IDCVa,k(--- <br /> Site Address:7s( S l aSc td-Q <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab E.Groundwork/Slab <br /> ❑Groundwork ❑Footing cr ough In n,-,1.L. <br /> Slab/Conduit ❑Foundation Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final HWT Final <br /> / — � So— <br /> OTHER OR CONSULTATION: LOX ' L 0 ? N�¢�QS <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.G.O. ❑ CORRECTION REQUESTED 1:1❑ OK FOR C.O. ` ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> /.. ., 4......4 1 Ong / <br /> /\,-( 7-- E z7t--/-? (0 <br /> Inspector: Date: 5 _ / 7 <br /> EIR(10/06) DATAB R,INC. <br />