Laserfiche WebLink
tr.' 1 INSPECTION REPORT <br /> e:?Mir_ Date `21`‘‘'`% Permit: le <br /> X546 <br /> Contractor: _S2 V0 %V\ <br /> Owner: 06 <br /> Site Address: 1A0—0C/ -- <br /> TYPE OF INSPECTION REQUESTED a 5 t+ <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> 1tlectrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ['Gas Pipe Final/ ❑HWT Final <br /> OTHER OR CONSULTATION: LU /_5-UPI:-25 JL5__ <br /> A PROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERM- <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> 01.1111.1.P <br /> 4111111110 <br /> Inspector: At __. Date: q' r: <br /> EIR(10/06) DATABAR,INC. <br />