Laserfiche WebLink
INSPECTION REPORT �� i•3S <br /> Date (4. _\k Permit: QA` 2 —OS 2 <br /> Contractor: T <br /> Owner: CEgae.):::✓�C <br /> Site Address: -j C�3 L) �Q`�.k�,i' A I LO--g4- <br /> 2 TYPE OF INSPECTION REQUESTED <br /> BUILDING MECHANICAL PLUMBING <br /> S.:�.•-.- ice ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid Li Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> r eiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ri -ctrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: 4,...- � \32-' T <br /> PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED El❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> a Ceic..e <br /> C _ <br /> / /I 0 " 4NIP1100 Inspector: Date: <br /> EIR(10/06) DATABAR,INC. <br />