Laserfiche WebLink
• <br /> From:Tony Lee [mailto:TLee@everettwa.gov] <br /> Sent: Friday,June 23, 2017 2:11 PM <br /> To: McGuire, Peter D<peter.d.mcguire@boeing.com> <br /> Subject: New portable building 45-116 <br /> Hi Pete, <br /> I have reviewed the plans for the new modular that were just dropped off—plan check#61706-043.The one issue I noticed is <br /> that neither these drawings nor the ones submitted for the 45-12 included the deck and stair details for the increased raised <br /> platform. If these were included in either set, please direct me to where they are. If not,we'll need the details and calculations <br /> for the new deck and stairs. <br /> Thanks,Tony <br /> NOTICE -This communication may contain confidential and privileged information that is for the sole use of the intended recipient. Any viewing, <br /> copying or distribution of, or reliance on this message by unintended recipients is strictly prohibited. If you have received this message in error, please <br /> notify us immediately by replying to the message and deleting it from your computer. <br /> 2��,n <br />