Laserfiche WebLink
, <br /> 16.The floor plans used for the engineering calculations are different than the construction <br /> drawings submitted for the permit. Provide letter from the structural engineer to verify <br /> that the drawings as submitted are consistent with the calculations for gravity loads, <br /> wind and seismic loading. <br /> All required submittals shall be of sufficient detail and contain sufFdent information to ensure <br /> that the proposed structure will be constructed in compliance with all adopted codes. <br /> Please be advised that a plan review fee will be charged to review the revised plans and a new <br /> building permit fee will be calculated based on the new total square footage of the structure <br /> submitted. <br /> Please prepare a response letter showing where each item in this <br /> correction letter is addressed on the plan set. <br /> Sincerely, <br /> Jeff ilman <br /> Development Technician <br /> 425-257-8976 <br /> Email:jheilmanaci.everett.wa.us <br />