Laserfiche WebLink
INSPECTION REPORT <br /> .‘04 .w.-....." Date fi/ ` ! (Q Permit: elba� 7 - It <br /> t r <br /> Contractor: I' / <br /> • <br /> Owner: <br /> Site Address: 602 ee'1/7 / ../9-‘.‘' <br /> 'E OF I .PECTION REQUESTED <br /> ELECTRICAL UILDING MECHANICAL PLUMBING <br /> ❑Temp Service 4 ..,' ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> El Groundwork Ci"ooting ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas <br /> PipePiFinal ❑HWT Final <br /> OTHER OR CONSULTATION: zcz` / D/q <br /> ❑ APPROVA ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FS' .C.O ❑ CORRECTION REQUESTED 1=1NI 0. OR ...•. ❑ VIOLATION <br /> L " E TO PERFORM INSPECTION: <br /> r/ ALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> fi30 N 1'5e A-741 <br /> ......„.„— .......__________ <br /> si 0& blirgi4-tvc 6,- Alt OA- <br /> (d4/i <br /> 11)67- re at <br /> i ___ <br /> \. <br /> Inspector: c7) F: Date: <br /> /1/1:—/e2 <br /> BR(10/06) D TABAR,INC. <br />