A PORTION OF THE S.W. 1 /4 OF THE N .E. 1 /4 OF
<br /> SECTION 6, T. 28N., R. 5E., W.M . � ,
<br /> SNOHOMISH COUNTY, WASHINGTON "
<br /> Certified Erosion and Sediment Control Specialist:
<br /> ssMH-2oo The name and phone number of the Certified Erosion and Sedimant Control
<br /> �pp R�M=3ss.s4 Specialist will be identified right prior to construction(when contractor has been
<br /> N IE=367.79 -
<br /> S IE=367.89 ,
<br /> � � se ected)
<br /> � Inspection and Monitoring:
<br /> All BMPs shatl be inspected,maintained,and repaired as needed to assure
<br /> � � � � � � continued performance of their intended function. Site inspections shall be
<br /> conducted a person who is knowledgeable in the principles and practices of
<br /> � � � erosion and sediment control. The�person must Ytave the skills to 1)assess the site
<br /> � conditions and construction activities that could impact the quality of stormwater,
<br /> � and 2)assess the effectiveness of erosion and sediment control measures used to
<br /> control the quality of stormwater discharges.
<br /> � Seasonal Work Limitations: �
<br /> From October 1 through April 30,clearing, grading,and other soil disturbing
<br /> activities sha11 only be permitted if shown to the satisfaction of the local �
<br /> permitting authority that silt-laden runoff will be prevented from leaving the site '
<br /> � 3 through a combination of the following:
<br /> 3 a. Site conditions including eXisting vegetative covarage, slope, soil type, and
<br /> STORM DRAIN INLET
<br /> PROTecTioN proximity to surface waters; and
<br /> b. Limitations on activities and the extent of disturbed areas; and
<br /> CH I LELLI c. Proposed erosion and sediment control measures.
<br /> 3 SER �E A CONDOMINIUM
<br /> �3 ( o o� The following activities are exempt from the seasonal clearing and grading
<br /> AF#9006285018 1imitations:
<br /> �� INSTALL � 1. Routine maintenance and necessary repair of erosian and sediment control BMPs; •
<br /> ce-2�s CONSTRUCTION ENTRANCE � 2. Routine maintenance of public facilities or existing utility structures that do not
<br /> RIM=388.51 ROCK PAD TEMPORARY SILT FENCE WITH J-HOOKS 8X OSZ tI10 SOlI OP IBSUIt lri t118 T0TT10V1I Of tI18 V0 et1t1V0 COVOY t0 SOIl' ariCl
<br /> IE=386.86 3 FND REBAR & CAP COE STD.DWG.:201 COE STD.4�NG.:214 p g '
<br /> LS#14078 3. Activities where there is one hundred percent infiltration of surface water runoff -
<br /> N0.02, W0.08 CONC. WAIL W/5' CHAINLINK FENGE N90'00'00"W 250.00 within the site in approved and installed erosion and sediment control facilities. •
<br /> 30. 3 2 W GRAPHIC SCALE Erosion Control BMPs Maintenance:
<br /> �y .y9� Z SITE GRADING:
<br /> RIM�388.3 O O O �9 '�, 16"DEC `` 20 0 10 20 40 192 CY CU T AND FI LL 1. All temporary and permanent erosion and sediment control BMPs shall be maintained
<br /> IE=386.93 o O O 14"HEMLOCK Y and re aired as needed to assure continued erformance of their intended function.
<br /> 3 ? p � � 15' IN. WIDTH 24"FIR (REMOVE) � p p
<br /> � o c�E"'°`�> LOT 24 ° Z Maintenance and repair shall be conducted in accordance with tha BMP specifications.
<br /> � � � � � � � � v 2. All temporary erosion and sediment control BMPs shall be removed within 30 days
<br /> � ( IN FEET ) after flnal site stabilization is achieved or after the temporary BMPs are no longer
<br /> o �
<br /> APPRO . LOCA ON OF Y � 1 inch = 20 ft. needed.
<br /> 30" W ER LIN PER � 24"FIR tr� 3. Trapped sediment shall be removed or stabilized on site.Disturbed soil resulting from
<br /> RECOR INFOR ATION w '
<br /> 3 o REMOVE) 3g6 o O removal of BMFs or vegetation shall be permanently stabilized
<br /> o � N o p
<br /> 0
<br /> 'ROX. LOCATION OF � � Z � W � `� � LEGEND
<br /> �/ATER LWE PER � '`� " x -
<br /> ORD INFORMATION � � � 0 39 3g � wr,�
<br /> � I � FOUND MONUMENT � WATER METER
<br /> � 3 � ��y x o AS DESCRIBED
<br /> 3 W '� o '� I o � FIRE HYDRANT
<br /> = z REMOVE EX.SHED • FOUND CORNER
<br /> APP . LOC TION OF 36°CEDAR o ICv
<br /> o � x o � IRRIGATION CONTROL VALVE
<br /> SA ARY SE R STUB � AS DESCRIBED
<br /> DRIVE o � P RECORD INFORMATION � (REMOVE) �6 g Q
<br /> CATCH BASIN `� POWER POLE
<br /> z� 3 FND REBAR S90'00'00"E 250.00 6' B ARD NCE S� SANITARY SEWER MANHOLE � POWER VAULT TOTAL PROJECT AREA: 15.000 SF
<br /> 3 �So.01,E0.01 ,,y� � ELEC J/BOX P��"
<br /> j �Q WATER VALVE a 2' MIN SETBACK
<br /> HIDDEN GREENS � TELEPHONE VAULT 2'""�" �MIN DEVELOPED IMPERVIOUS AREA:
<br /> ,� � _2�2 A CON D OM I N I U M � CABLE TV PED `'- "Ax FI" S`�E STRUCTURES 5,589 SF
<br /> � � �� -3$9�$ AF 2007�7205315 1� EXST GROUND DRIVEWAYS 3,859 SF
<br /> .7# 2 MI WALKWAYS 1,3Q0 SF�
<br /> //
<br /> 3 FND CONC M N �MA7( CUT SLOPE -
<br /> � �N C SE 'a' = 1/2 HEIGHT �F FILL, 20' MAX TOTAL 10.748 SF '
<br /> 12- -14
<br /> LS LANDSCAPE AREA 'a' = I/S HEIGHT OF CUT, 10' MAX
<br /> s GRADING NOTE: MINIMAL SITE GRADING GRADING REQUIRED FOR THIS SITE TYP ��,- 8c FILL SECTIO�► EXISTING IMPERVIOUS AREA:
<br /> �I AT PROPERTY LINE
<br /> � 3 C�EARING LIMITS NOTE: ENTIRE SITE WILL CLEARED FOR CONSTRUCTION ACTIVITIES SHED 410 SF
<br /> 3 g FND CONC M ►v TOTAL 410 SF
<br /> �= IN CASE
<br /> 12-2-14
<br /> PP � TOTAL NEW IMPERVIOUS AREA: 10 748 SF
<br /> � 3 wv T.E.S.C. LEGEND
<br /> 3 M
<br /> I I/V
<br /> O � O Stabilized Construction Entrance/Exit PER COE STD. DWG.: 201
<br /> SILT FENCE PER COE STD. DWG.: 214
<br /> CONSTRUCTION SEQUENCE: �
<br /> l. Arrange and attend pre-construction meeting. Certified erosion control specialist shall be identified at the
<br /> � � � pre-construction meeting. '
<br /> � � 2. Flag property lines and clearing limits.
<br /> � 3. Install erosion control measures and devices per approved plans.
<br /> 4. Install silt fences or hay bales controls; install catch basin protection inserts;adjust as needed during construction. �
<br /> � i. PERFORM MAINTENANCE IN ACCORDaNCE WiTH STANDARD SPcCIFICATION 8-07.3(15). '
<br /> � Insure all surface flows are controlled and routed through TESC control
<br /> GRATE 5" IdAX. TRIM GEOTEXTILE � '
<br /> �'j 2. SIZE THE BELOW GRATE INLET DEV�CE (BGID) FOR T'rlc STORM WATER STRUCTVRc �
<br /> � � IT WILL SERVICE. . ear gru and rough grade.
<br /> FRAME OVERFLOW BIPASS 3. THE BGID SHALL HAVE A BUIL7-IN HIGH-FLO'N REI.IEF s�rsT_fn �ovF���ow 3�«a�5>. 6. Complete site excavation and grading activities in accordance with plans.
<br /> � o�a� 4, THE RETRIEVAL SYSTEM MUST ALLOW REMOVAL OF TH= BGID WITHOUT S?ILIIMG r�= Soil Amendment: 7. Install all utilities.
<br /> 0
<br /> co��ECTEo MArER�A�. The area where soils have been disturbed,the soil shall be amended according to the following procedures: 8. Hydro seed,mulch, and plant landscape �
<br /> � sEo�MENr ANo oEBR�s �RAtE 9. Remove remaining TESC structures after the site has been stabilized and approved by the City inspector
<br /> �Q RETRI_�/:.� >tsr_�� l. Scarify subsoil to a depth of one foot. 10. Full compliance with DOE best management practices is required for this project
<br /> 4 . 'Y�:�;��� 2. In planting beds,will place three inches of compost and till in to an eight-inch depth.
<br /> H�w;b
<br /> d 3. In turf areas,will place two inches of compost and till in to an e�ight-inch depth.
<br /> 4. Apply two to four inches of arborist wood chip,coarse bark mulch, or compost mulch ,
<br /> PILTERED to planting beds after final planting. . . .
<br /> � WATER . . � � �
<br /> O`JERr OY7 3'Y?ASS
<br /> oa .
<br /> GEOTEXTILE � .
<br /> ��� 4,
<br /> a
<br /> a
<br /> �,��'����;x.� � � ° ��`�� ��
<br /> This Record Drawing has been prepared, in �art, based
<br /> �,oT To sca�: on "As-St!ilt" inforrr�ation provided by others.Though '
<br /> NOT To scA�E the as-built information and this dra�+iing are based on
<br /> STORM DRAIN INLET PROTECTION
<br /> the best ai ble infon�nation, no presumption should
<br /> be ma e re rdin the dr i g7 uracy. '
<br /> _c------- � _" � �-
<br /> � �' I
<br /> �ignea 6y Date
<br /> . �'o,t °U / j���+��� Permit Inspector -
<br /> � �'rint ��ame itie .
<br /> ,
<br /> MAHER WELAYE, P.E._ �R WF� 9 UNITS CONDOS
<br /> OWNER/APPLICANT�CONTACT: P�oF WAsti, ��- EROSION CONTROL 8c GRADING PLAN
<br /> AHMET KULAGA 155?6 - 56TH AVE. W
<br /> 1205 130th St SE UNIT A EDMONDS, WA 98026 ��� � ��"Z� f Or •
<br /> EVERETT, WA 98208 PH.• (206) 816-0455 AHMET KULAGA
<br /> maherwelaye�gmail.com
<br /> 425-501 -6441 ���,SSctsTER�����"� DRAWN BY M. W. DATE 11/08/2015 JOB N0. 14-121 �
<br /> �oNA� E SITE ADDRESS
<br /> ExP�REs os-�s-__ 5805 HIGHWAY PL. cHECKE� BY M. W. SCALE 1" = 20' SHEET
<br /> i EVERETT, WA 98203 2 OF 5