Laserfiche WebLink
/777 A <br /> With 10' of S. lands and 5' of N. landscape, that !Oates to 30% of <br /> property landscaped, excluding frontage landscaping. <br /> Uncounted are the two current Japanese Maples, plus added two Pyramidal <br /> Evergreens, that together screen front of property from rear of property. <br /> Frontage landscaping additionally has uncounted a 5' Rhodie in front of <br /> property line, and at least 4 pyramidal emerald greens (as screening for the <br /> walk-up to the porch). The limited space left being grass or rockery. <br /> Asphalt regrading: Asphalt leading to the garage will be regraded to a max <br /> 10% slope. Existing ground drain shown. <br /> Interior: <br /> Floor 2: building walls and doorway by office 3 to form another upstairs <br /> office 3A, with intervening space to be used as either storage, or to allow <br /> office 3 to use area 3A as sub-office. Standard double stud /header for new <br /> door in non-supporting wall. Standard 2x4 wall construction, sheetrocked, <br /> studs 16" on center, double studded corners and top/bottom studs. <br /> Floor 1 : <br /> 'install 1 hour fire door, self-closing, metal frame, standard double <br /> stud/header construction, fill any voids with fire-rated foam, .5" sheetrock <br /> finished walls inside stairwell and outside stairwell. Easy open lever handles. <br /> 1,3 E., Q_ o u--r_ - eSc I w..,' <br /> •3.5' 3.5" lift Ramp into kitchen -short, no rails. Move stove outlet to <br /> accommodate ramp, add microwave/vent hood (separate electrical /plumbing <br /> permits submitted by contractors) <br /> Basement: <br /> •Remove existing S. door, build wall there w/ stanard 2x4's. Sheetrock. <br /> Install new door on end of utility room; standard double stud /header <br /> construction. <br /> • wherever sheetrock is currently missing, insulate basement ceiling to <br /> minimum R19 (max that fills the cavity), and .5" sheetrock. <br /> •Washer and dryer moved to basement (separate electrical /plumbing <br /> permits submitted by contractors) <br /> • HVAC covered under separate permit. <br /> Signage: signage permit attached for front and back of building. Building 4"+ <br /> H numbers added on the rear of the building. 5.ep; ;� �,� y� � <br /> Ramp: built to ramp code. Copy of applicable ramp code attached. <br />