My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3310 MCDOUGALL AVE 2019-09-06
>
Address Records
>
MCDOUGALL AVE
>
3310
>
3310 MCDOUGALL AVE 2019-09-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 8:21:20 AM
Creation date
1/28/2019 3:40:08 PM
Metadata
Fields
Template:
Address Document
Street Name
MCDOUGALL AVE
Street Number
3310
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kirk Brooks <br /> To: pnewland@whidbey.net <br /> Cc: Paul McKee;Arnie Roshak;Joseph Smeby <br /> Subject: RE: 3310 McDougall/Newland Warehouse Project <br /> Attachments: 20170803171056305.pdf <br /> Peter, <br /> I have attached a markup that I feel blends your concerns for being practical and economical with the Sewer/drainage <br /> departments concerns for utility system design.The solution shown will provide a more direct route to the 18" pipe in <br /> 33rd St which has a slope of 0.75%and was installed in 2002.Whereas,the plan as submitted,would sent the storm <br /> water to a 12" pipe that has a slope of.11%and was installed in 1925. It seems obvious the proposed revision is the <br /> correct course of action hydraulically and will also address your concerns by make a minimal change in project cost. <br /> I'm prepared to move ahead with getting your permit ready shortly after an acceptable revision is made and submitted. <br /> As always, I'm open to discussion. <br /> Best Regards and have a good evening. <br /> Kirk <br /> From: pnewland@whidbey.net [mailto:Dnewland@whidbey.net] <br /> Sent: Thursday, August 03, 2017 8:59 AM <br /> To: Kirk Brooks <br /> Subject: Re: 3310 McDougall/ Newland Warehouse Project <br /> Thanks much appreciated! <br /> Sent from my iPhone <br /> On Aug 3, 2017, at 7:45 AM, Kirk Brooks<KBrooks(a@everettwa.gov>wrote: <br /> Peter, I'm getting the brain trust together this afternoon to discuss this. Get back to you soon. Kirk <br /> From: pnewland@whidbev.net [mailto:pnewland@whidbey.net] <br /> Sent: Wednesday, August 02, 2017 4:34 PM <br /> To: Kirk Brooks <br /> Subject: Re: 3310 McDougall/Newland Warehouse Project <br /> Hi Kirk <br /> Just checking in regarding the combined sewer issue. I'm hoping folks understand the <br /> practical and economic difficulties of forbidding the use of our existing connection especially in light of <br /> everyone's agreement that our project does not increase the historical usage. <br /> Feel free to give me a call at 425 754 0700. <br /> Thanks <br /> Peter <br /> Sent from my iPhone <br />
The URL can be used to link to this page
Your browser does not support the video tag.