My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3310 MCDOUGALL AVE 2019-09-06
>
Address Records
>
MCDOUGALL AVE
>
3310
>
3310 MCDOUGALL AVE 2019-09-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 8:21:20 AM
Creation date
1/28/2019 3:40:08 PM
Metadata
Fields
Template:
Address Document
Street Name
MCDOUGALL AVE
Street Number
3310
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 9 AUG 1017 <br /> PUBLIC WORKS PERMIT bate Applied: 6/6/2017 <br /> City of Everett Public Works Department Public Works Permit#: PW1706-015 <br /> 3200 Cedar Street Parent Permit#: <br /> Everett,WA 98201 Planning Reference#: <br /> f~ (425)257-8810 Public Works Fee: $2503.87 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> Hill Street Investments NEWLAND PETER <br /> Po Box 5459 <br /> Everett, WA, 98206 <br /> PHONE: PHONE: 4257540700 <br /> TAX PARCEL ID#: SITE ADDRESS: 3310 MCDOUGALL AVE <br /> DESCRIPTION: SITE DEVELOPMENT FOR A 10,000SF WAREHOUSE AND SHOWROOM <br /> THIS PERMIT COVERS SITE AND STREET IMPROVEMENTS AND SEWER, WATER AND DRAINAGE SYSTEMS <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett`Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans, SWPPP, and drainage report approved by the City of Everett Public Vrks <br /> Department dated 08/21/2017. Approved plans must remain on job-site at all times. rrl <br /> fr.-I—i— r� <br /> , <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior trAsJctica to set up a <br /> pre-construction consultation. All inspections must be formally requested. See the attached an d; ond-number and <br /> online instructions to Request an Inspection. <br /> ' 'i s-r 1 c <br /> 6.Contact the City Planning Department for a final landscaping inspection after the job is comte. (Kembra Landr �2 - <br /> 257-8808) ri `- <br /> ,� r••.a <br /> LT1 '=] <br /> 7. The issuance of this permit is specifically limited to the Public Works items. Additional p r,.arf.FgEttiwill be necessary for=� <br /> further construction. The owner or owner's agent assumes all risk and responsibility of sec Jr IdjIonal permit; <br /> required for the continued construction of the structure. Public Works permit issuance doeg�'acr`aox'atifhe City of Esv,@rett <br /> will be able to issue subsequent, required permits for further construction and is being issu64 6t of the rar 'r or <br /> owner's agent. ' ,`'" <br /> co <br /> Public Works Permit Fee Breakdown: j -, 4-t ../ <br /> Paving (parking lot) $45.00 <br /> Erosion Control $200.00 <br /> PW Plan Review $752.96 <br /> PW Site Inspection $1505.91 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> Imo' j expenses,or causes of action that may arise because of installation and <br /> ��� ���8 ( maintenance of the improvement or other right-of-way use here to applied <br /> App .ved for Construction (Public Works) Date for and fu •-r agrees to r ove same upon notice from the City and to <br /> repl-ce puolic p .erty da ged thereby. <br /> FINAL INSPECTION Date ��~ f- <br /> 1-- 2,9 'I:j <br /> Approved as Constructed (PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF ORK ON THIS PROJECT OVER 90-DAY DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.