Laserfiche WebLink
4. SWPPP NARRATIVE <br /> The intent of this section is to provide the information necessary to support the <br /> engineering plans to implement a.design that will; reduce, eliminate or prevent the <br /> discharge of stormwater pollutants, meet or exceed the water quality and sediment <br /> management standards for the City and State, and prevent adverse impacts to the <br /> receiving waters for this project. Note; this narrative is intended to support the SWPPP <br /> that is included with the Targeted Drainage Plans also a part of this submittal package to <br /> the City. <br /> A. SITE GRADING/EROSION CONTROL RISK ASSESSMENT <br /> Area proposed to be cleared/worked: 0.52 acres <br /> Average slope for the project site: 2% (Area of Disturbance Only) <br /> Erosion Hazard of Soil Low <br /> Critical Areas downslope No <br /> Site is upstream of an ESA Stream No <br /> Based on the above information and the fact that the area of the project site to be <br /> disturbed is flat and construction site runoff will pass through silt fencing or other perimeter <br /> filtration features prior to leaving the short plat, and that if site conditions warrant, <br /> additional BMP's can be implemented as corrective measures the Risk Category for this <br /> site is Low Risk. <br /> B, SWPPP MINIMUM ELEMENTS <br /> 1: Preserve Vegetation and Mark Clearing Limits <br /> The first step in the construction process is for the contractor to fence the limits of <br /> clearing/disturbance (BMP C103) prior to any other construction activity. The engineering <br /> plans locate and provide the square footages for the areas of grading, clearing, impervious <br /> surfaces and un-disturbed areas on the proposed project site. The entire project area will <br /> be cleared or disturbed for this project and removal of the existing building and parking <br /> area. <br /> 2: Establish Construction Access <br /> The SWPPP calls for the proposed construction entrance (BMP C105) to be installed as <br /> the second step after the staking of clearing limits. The construction entrance for this <br /> project will be along the eastern property line in the location of the future driveway access. <br /> At this time winter work is expected during the wet season. <br /> 3: Control Flow Rates <br /> This project is below the thresholds requiring flow control for the project. <br /> 4: Install Sediment Controls <br /> This site SWPPP proposes to construct/maintain a gravel entrance (BMP C105), <br /> vegetative buffer (BMP C102), silt fencing (BMP C233) and retention,of the existing <br /> vegetation (BMP C101) that will provide a vegetated strip around the work area and any <br /> adjacent property line. The construction of these features should be completed before the <br /> clearing and grading of the site. Mulch (BMP C121) will also be used on the exposed soil <br /> McDougall Warehouse 17-0212 <br /> April 2017 Page 6 <br />