Laserfiche WebLink
PUBLIC WORK <br /> $041iiiiainsimegefiggiaggise moup.mteve faysisimossel <br /> meamodanItemionagiosigia genVilitkomNViiitiVile0.1.% •Amount <br /> wginuontose gogig,„„taregga„,:mg: a!:J;,i,andampamogio.iiMMAROMEGgegg <br /> Construction Storm Drainage <br /> Temporary Silt Fence L.F. 85 5.00 425 <br /> Grading for drainage swales L.F. 2.00 <br /> Other (CB INLET PROT.) EA 12 75.00 900 <br /> Other <br /> Construction Storm Drainage Total $ 1,325 <br /> Clearing &Grading <br /> 12"wide area L.F. 2.50 <br /> Right-of-Way L.F. 250 12.00 3,000 <br /> Other <br /> Clearing and Grading Total: $ 3,000 <br /> COST EST FEE CALC-2014 <br />