My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4205 RIDGEMONT DR 2019-01-28
>
Address Records
>
RIDGEMONT DR
>
4205
>
4205 RIDGEMONT DR 2019-01-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2019 4:00:34 PM
Creation date
1/28/2019 4:00:22 PM
Metadata
Fields
Template:
Address Document
Street Name
RIDGEMONT DR
Street Number
4205
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLI�IIIVORKS PERMIT IIII II IIII Applied: 6/18/2018 <br /> /14/60•••••••••4 City of Everett Permit Services PuU11�llo Date Permit#: P/18/20 028 <br /> 3200 Cedar Street, 2"a Floor Associated Bldg Permit#: <br /> Everett,WA 98201 Planning Reference#: <br /> (425)257-8810 Public Works Fee: $80.00 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> NIXON LYNN A& LARTER WILLIAM E NIXON LYNN A& LARTER WILLIAM E <br /> 4205 RIDGEMONT DR 4205 RIDGEMONT DR <br /> EVERETT,WA, 98203 EVERETT, WA, 98203 <br /> PHONE: 4252584004 PHONE: 4252584004 <br /> TAX PARCEL ID#: 00464700007201 SITE ADDRESS: 4205 RIDGEMONT DR <br /> DESCRIPTION: NEW ROCKERY IN RIGHT-OF-WAY <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett`Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site work to be done per plans approved by the City of Everett Public Works Department dated 6/18/2018. Approved <br /> plans must remain on job-site at all times. <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction for a <br /> consultation, to evaluate Erosion/Sedimentation control set-up. All inspections must be formally requested. Set,'the°attidthed <br /> handout for phone number and online instructions to Request an Inspection. +-� � <br /> 6. Install and maintain erosion control measures per City of Everett Standards. Remove uporekozof th4 project prior <br /> to final approval of the permit. R; <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. c .3 <br /> 8. Protect all existing underground utilities during construction. <br /> ra :� <br /> 9. This wall constructed within the public right-of-way must be removed or relocated at the owner's expense ithe tiit ever <br /> requires use of the right-of-way for municipal purposes. o� <br /> 10. Any damage to City improvements (sidewalk, curb, roadway, etc.) shall be replaced per CityStandards and/or as ; <br /> directed by the City PW Inspector �? <br /> 11. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. yall the inspection lirto <br /> request a Final for this permit when all items have been completed. cc <br /> Public Works Permit Fee Breakdown: 1' <br /> — IX)C" <br /> Retaining wall in the ROW $40.00 <br /> -^a <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> C , // harmless the City of Everett from any and all claims for damages,costs, <br /> VL /' ` Adi ;- /1. expenses,or causes of action that may arise because of installation and <br /> a` maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) Date for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> FINAL INSPECTION Date <br /> %pIkant <br /> , c— / a11 ' <br /> ign ure Approved as Constructed (PW Inspector) Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br /> Fic.E <br />
The URL can be used to link to this page
Your browser does not support the video tag.