Laserfiche WebLink
• INSPECTION REPORT <br /> <N,'-1, <br /> Date A jt Permit: e y C,05- O 53 <br /> t'C��'" Contractor: __Sera o yule, atc.,41-1 G <br /> ` Owner: Chi 04' -EV, .. ..-1.- <br /> Site <br /> ...Site Address: 112.` St Mo W <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit El Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> g1 Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑,Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: 1125_ -75O_--! 7t-Li <br /> o,tPPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PER – <br /> .K FOR T.C.O. ❑ CORRECTION REQUESTED <br /> • OK FOR C.O. ❑ VIOLATION <br /> • UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION–24 hour notice required <br /> 0 `I -�"\. <br /> Inspector: L / Date: 4Is3 <br /> EIR(10/06) DATABAR,INC. <br />