Laserfiche WebLink
INSPECTION REPORT <br /> /' � Date ('/Z 'A: Permit: 1�5 0 l <br /> Contractor: Z-i f 4®i2e <br /> ' 'af <br /> Owner: J// j <br /> Site Address: n3 0 5e &€A 1 <br /> 7/ /,/c/..7 <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork El Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑C iling Grid El Drywall Nailing ❑Plumbing Final <br /> lectrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains El Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> •dt PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMI- <br /> ►A OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> • OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> El CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> • -O <br /> PIP (Sfl i%kol 6T-t.( " , r©,-. c...z.-4:s <br /> Inspector: Date: 6 2 <br /> EIR(10/06) DATABAR,INC. <br />