Laserfiche WebLink
40- INSP CTION REPORT <br /> /N/....,,,:i:,:,,R <br /> Date `4 Permit: E ` vc-i 2-- 0 4 2 <br /> .47 <br /> Contractor:let,.. , J L <br /> Owner: y <br /> Site Address: —1 2'Z T __c y,. 11 <br /> ECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> Te ice ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> uit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> h I ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> • - e •R CONSULTATION: <br /> Pi <br /> i i ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED ill <br /> • OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> (2)k— (2-0Le4, j <br /> Inspector: • Date: <br /> - r."------- —4/94-- <br /> R EIR(10/06) DATABAR,INC. <br />