My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5019 EVERGREEN WAY BANK OF AMERICA 2019-01-29
>
Address Records
>
EVERGREEN WAY
>
5019
>
BANK OF AMERICA
>
5019 EVERGREEN WAY BANK OF AMERICA 2019-01-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2019 10:50:56 AM
Creation date
1/29/2019 10:50:54 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
5019
Tenant Name
BANK OF AMERICA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC IORKS PERMITateAppliedo 9%14p <br /> i7 <br /> City of Everett Public Works Department Public Works Permit#: PW1709-027 <br /> 3200 Cedar Street Parent Permit#: B1708-025 <br /> Everett,WA 98201 Planning Reference#: <br /> (425)257-8810 Public Works Fee: $85.00 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> BANK OF AMERICASt-Fal-EiTER-JEM cams <br /> 101 N TRYON ST <br /> CHARLOTTE, NC, 28255 , <br /> PHONE: PHONE: 5106257467 <br /> TAX PARCEL ID#: 00581900001702 SITE ADDRESS: 5019 EVERGREEN WAY <br /> DESCRIPTION: PAVING AND STALL STRIPING -BANK OF AMERICA <br /> VOLUNTARY ACCESSIBLE UPGRADES. RESTRIPING TO INCLUDE STANDARD NON-ACCESSIBLE STALLS. SCOPE <br /> ALSO INCLUDES CONCRETE WALKWAY ADDITION AND REPLACEMENT. <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett`Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved (as noted) by the City of Everett Public Works Department dated <br /> 9/14/2017. Approved plans must remain on job-site at all times. <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction for a <br /> consultation, to evaluate Erosion/Sedimentation control set-up, and with all other inspection requests, including formwork <br /> prior to pouring concrete and striping layout prior to striping. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector. <br /> Remove upon completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. Stall striping must be in compliance with City of Everett Standard Drawing#340 (attached for reference). Compact stalls <br /> are not permitted. <br /> 10. This permit must be finaled in order to close out this permit. Call the inspection line to request final inspection <br /> (425-257-8881). <br /> Public Works Permit Fee Breakdown: Se Cize <br /> Paving $45.00 <br /> PW Plan Review $20.00 OCT 3 1 2017 11"), <br /> PW Site Inspection $20.00 <br /> CITY pF EVERFTT <br /> Perfnit Services <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> /G6 <br /> "/ harmless the City of Everett from any and all claims for damages,costs, <br /> r ' expenses,or causes of action that may arise because of installation and <br /> --." L / maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) Date for and further agre- t. emove same upon notice from the City and to <br /> rept blicc pro.erty • aged thereby. <br /> FINAL INSPECTION Date 1013 t S� <br /> Approved as Constructed (PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.