My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5019 EVERGREEN WAY BANK OF AMERICA 2019-01-29
>
Address Records
>
EVERGREEN WAY
>
5019
>
BANK OF AMERICA
>
5019 EVERGREEN WAY BANK OF AMERICA 2019-01-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2019 10:50:56 AM
Creation date
1/29/2019 10:50:54 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
5019
Tenant Name
BANK OF AMERICA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REG_ O8-18-2017(rRI) 10:15 <br /> REG-I 013701 <br /> LI 1 <br /> PERMIT NoJ7 80 25 <br /> 1 Pg, $554.9 03 BUILDING DEPARTME <br /> u . 'ETT 3200 CEDAR ST <br /> $554.94 EVERETT. WA. 98201 4516 <br /> (425)257-8810 CARD $554,9 <br /> 425-257-8810 <br /> Phone Order <br /> xxxxxxxxxxxx6517 <br /> VISA Entry Method: Manual <br /> Plan Check No.: B1708-025 <br /> Amount:$ 554.94 <br /> Application Date: 8/18/2017 Tax: $ 0.00 <br /> Tenant: BANK OF AMERICA <br /> Total: $ 554.94 <br /> 08/18/17 11:02:15 <br /> Owner: BANK OF AMERICA Inv 4: 000000006 APPr Code: 008337 <br /> Job Address: 5019 EVERGREEN WAY APPrud: OnlineAVS Code: ZIP MATCH Z <br /> Proposed Use: COMMERCIAL CVV2 Code: MATCH M <br /> Description of Work: VOLUNTARY ADA UPGRAI CU5LOMer coag <br /> AMERICA <br /> Plan Check Fee Paid: $554.94 <br /> The building permit application for the above-referenced project is being conditionally accepted for filing <br /> pending the determination of its completeness. <br /> If the City review determines that any additional land use approval or any additional information is <br /> required to complete your building permit application,it will be necessary to submit this additional <br /> information or acquire the additional land use approval prior to your application being considered complete <br /> for filing.If no other land use approval or additional information is required,your building permit <br /> application will be considered filed as of this date. Plan review fees are estimates. Final plan review fees <br /> will be calculated at permit issuance. <br /> BUILDING PERMIT APPLICATIONS EXPIRE IF NO PERMIT IS ISSUED <br /> WITHIN 180 DAYS FOLLOWING THE DATE OF APPLICATION. <br /> APPLICANT COPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.