Laserfiche WebLink
INSPECTION REPORT <br /> -,--- <br /> Date7.___.__,-;,.. 77Permit:�����0‘22 —.:‘,/,3, <br /> moor -,* <br /> Contractor: <br /> Owner: ME- I'•3 O€s'r o - <br /> Site Address: �oO Vtk& ,4, <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing LI Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final LI HWT Final <br /> OTHER OR CONSULTATION:_ - ON/T —�fj�-- og'O/1 <br /> ❑ APPROVAL ART ROVAL FINAL APPROVAL THIS PERMIT <br /> III OK FOR T.C.O. RRECTION REQUESTED <br /> E l OK FOR C.O. VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> I 1 AEL(425)257-8881 FOR REINSPECTION/ —24 hour notice required <br /> AIDEp —' ff- <br /> r 6- 4;T O�&#m,,T k/41? ea <br /> 6, iN t RWiAi 3bEry, <br /> 5E. <br /> 4 Y1 <br /> poi 7(PS--?.5" -8 F5/ <br /> Inspector: ,r ` ` Date: 7.--023-/1 <br /> EIR(10/06) DATABAR,INC. <br />