My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2106 RAINIER AVE 2019-01-29
>
Address Records
>
RAINIER AVE
>
2106
>
2106 RAINIER AVE 2019-01-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2019 2:10:41 PM
Creation date
1/29/2019 2:10:33 PM
Metadata
Fields
Template:
Address Document
Street Name
RAINIER AVE
Street Number
2106
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Activity Work Order Page 1 <br /> 1/10/2019 8:46 <br /> Issued By MDE MACELLARI,DAVID E. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 9/4/2018 <br /> Fund 401 Account 5 Program 710 Function los Activity 675 <br /> Program <br /> Title REPAIR 2106 RAINIER AVE 710109675 <br /> Work Order No 20182175 Project Activity Type SERVICE REQUEST Status CL <br /> Status 9/4/2018 Time 13:48 Original WO Billing <br /> Customer Information <br /> Customer Name SULHAM,MATT Customer Id <br /> Address Street <br /> Apartment No City <br /> State Zip <br /> Subdivision Change Map Y/N <br /> Phone No ( 425 ) 246-1455 Ext <br /> Second Phone ( ) Ext <br /> E-Mail Address <br /> Problem Information <br /> Address 2106 Street RAINIER AVE <br /> From Cross Street <br /> To Cross Street <br /> City Zip <br /> Subdivision Map Book Map Reference <br /> Problem SEWER SEWER <br /> Sub Problem <br /> Requested By CJM1 COLEMAN,JOSHUA M. Date Requested 6/18/2018 <br /> Agency Related Request 00176916 <br /> Initiated From PUBLIC PUBLIC <br /> Utility Locate(USA) No Called Date Expiration Date <br /> Assignment Information <br /> Dept Priority Estimated Hours <br /> Crew SCONST SEWER CONSTRUCTION(OLHAVA) <br /> Contractor <br /> Assigned To OBS OLHAVA,BRAD S. <br /> Assigned By <br /> Assigned Date To Be Comp Date <br /> Scheduled Date Scheduled Time <br /> Route Route Sequence <br /> Comments <br /> Action Taken REPLACED 4"CLAY SIDE SEWER WITH 6"PVC FROM PROPERTY LINE TO MAIN.DEPTH OF <br /> MAIN AT NEW INSERT-A-TEE 7'4".DEPTH OF TOP OF STANDPIPE 3'9".DEPTH OF SIDE <br /> SEWER AT CLEANOUT 2'10".INSTALLED CLEANOUT AND PAD PER CITY STANDARD AT <br /> PROPERTY LINE. <br /> Recommended Action <br />
The URL can be used to link to this page
Your browser does not support the video tag.