GECJ _ FIELD REPO._ <br /> ' <br /> I Project Name: Everett River Front-Simpson Report: 101 <br /> I GeoDesign#: Polygon-127-03 Date: 3/7/2018 <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> PW1505-005 <br /> i ) <br /> Nick Abdelnour(Polygon) Randy Allen(City of Everett) Weather: Clear, 30's <br /> Ron Bowen(Polygon) Eddy Stevens(Polygon) Arrival/Departure: 1115/1130 <br /> t Distribution: — —i <br /> Doug Ross(Polygon) Kirk Keck(City of Everett) <br /> Paul McKee(City of Everett) Dave Foster(City of Everett) Prepared By Ben Weinberg, EIT <br /> Attachments <br /> m Site Plan(s) 0 Density Test Summary Signature: �✓ <br /> ❑ Installation Records 0 Other Reviewed By ' n <br /> PURPOSE of VISIT: GeoDesign representative, Ben Weinberg, was on-site part time at the request of Craig with DDS to <br /> observe foundation subgrade for Lots 154. <br /> SUMMARY OF OBSERVATIONS: <br /> Lot 154: <br /> Previously, GeoDesign noted an approximately 15 feet long and 6 feet wide triangular section along the southeast corner of <br /> the lot area which could be probed 1.5 to 2.0 feet using a 1/2 inch diameter soil probe that we recommended be removed <br /> and replaced with structural fill material. Today, GeoDesign noted that DDS over-excavated the previously identified area <br /> down to firm and unyielding soil and backfilled with the area with a 2-inch clean crushed rock material compacted into a firm <br /> and unyielding mass. <br /> It is the opinion of GeoDesign that exposed foundation subgrade observed today is currently suitable for support of the <br /> intended structure. GeoDesign recommends that any surficially loose and saturated material that may be generated be <br /> removed from the base of foundation areas prior to the placement of concrete. Foundations should not be poured on frozen <br /> ground; any soils loosened from frost-heave should be removed from the base of foundation areas prior to placement of <br /> concrete. <br /> A summary of observations and dersity tests taken can be found in the attached Figure 1. The contractor was notified of <br /> our observations prior to our departure from the site today. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not include supervision or direction of the contractor,the contractor's employees <br /> or agents. Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered <br /> final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By'section. <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 <br />