My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2425 39TH ST ROYELL MANUFACTURING INC 2019-12-09
>
Address Records
>
39TH ST
>
2425
>
ROYELL MANUFACTURING INC
>
2425 39TH ST ROYELL MANUFACTURING INC 2019-12-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2019 3:33:04 PM
Creation date
1/30/2019 8:11:08 AM
Metadata
Fields
Template:
Address Document
Street Name
39TH ST
Street Number
2425
Tenant Name
ROYELL MANUFACTURING INC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10: Control DeWatering <br /> DeWatering should not be necessary for this project. However, the existing pond system <br /> on-site would be available to collect any water from construction for sedimentation and <br /> disposal if necessary. <br /> 11: Maintain BMPs <br /> The construction supervisor will be responsible for maintaining all BMPs during <br /> construction and working with the City to relocate or add BMPs as necessary as site <br /> conditions change. BMPs should be inspected and maintained-as needed after every rain <br /> event producing more than %4" of rain in a 24-hour period. Also, BMPs shall be inspected <br /> on a weekly basis even if site work is not occurring. <br /> 12: Manage the Project <br /> It will be the responsibility of the Contractor and Developer to manage this project and <br /> coordinate with the City Inspector and Engineer. <br /> Inspection and Monitoring: <br /> Site inspections shall be done by a person who is knowledgeable in the principles and <br /> practices of erosion and sediment control. The person must have skills to first assess the <br /> site conditions and construction activities that could impact the quality of stormwater, and <br /> second assess the effectiveness of erosion and sediment control measures used to <br /> control the quality of stormwater discharges. <br /> Whenever inspection and/or monitoring reveals that the BMPs identified in the <br /> Construction SWPPP are inadequate, due to the actual discharge of or potential to <br /> discharge a significant amount of any pollutant, appropriate BMPs or design changes shall <br /> be implemented as soon as possible. <br /> Maintaining an Updated Construction SWPPP: <br /> The construction SWPPP shall be retained on-site or within reasonable access to the <br /> short plat. The SWPPP shall be modified whenever there is a change in the design, <br /> construction, operation, or maintenance at the construction site that has, or could have, a <br /> significant effect on the discharge of pollutants to waters of the state. <br /> The SWPPP shall be modified if, during inspections or investigations conducted by the <br /> owner/operator, or the applicable local or state regulatory authority, it is determined that <br /> the SWPPP is ineffective in eliminating orsignificantly minimizing pollutants in stormwater <br /> discharges from the site. The SWPPP shall be modified as necessary to include <br /> additional or modified BMPs designed to correct problems identified. Revisions to the <br /> SWPPP shall be completed within seven days following inspection. <br /> 5. SOURCE CONTROL <br /> This project proposes to construct a new paved access to this property. Per Volume 1 of <br /> the City of Everett 2017 Stormwater Management Manual residential development does <br /> not require source control. <br /> Royell Manufacturing 15-0714 <br /> July 2017 Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.