Laserfiche WebLink
Anstey Engineering <br /> 8627 NE 180th Street <br /> Bothell,WA 98011 <br /> Phone:206-303-7639 <br /> Fax:425-486-0267 <br /> E-mail:benanstey@juno.com <br /> March 3,2017 <br /> Legal Description:Lot 1 CITY OF EVERETT SHORT PLAT NO. 1202-2007-045,RECORDING <br /> NUMBER 201503035001,RECORDS OF SNOHOMISH COUNTY,LOCATED IN CITY OF <br /> EVERETT,COUNTY OF SNOHOMISH. <br /> Located near 55th Street and Lowel Road on Tax Parcel no.00495800701003 <br /> Everett,WA <br /> C-SWPPP <br /> Section 1 Narrative: <br /> 1. The clearing limits will be marked with fencing. The clearing limits will basically <br /> be the boundary of the site as limited space is available. <br /> 2. A Rock Construction Entrance will be provided per C105 to allow entrance and <br /> exit from the site without tracking dirt off of the site. <br /> 3. This small project does not require the control of stormwater flow rates as less <br /> that 5,000sf of impervious surface will be provided per 2.1.1. <br /> 4. Sediment control will be provided by use of a silt fence per C233,mulching per <br /> C121 and storm drain inlet protection per C220 <br /> 5. Soils will be stabilized by use of mulching per C121 <br /> 6. Protection of slopes is not requires as no steep slopes will be affected by this <br /> project and none will be cleared. <br /> 7. No Drain Inlets will be protected as there are none near the site. <br /> 8. Stabilization of Channels and Outlets is not required as none exist on this project. <br /> 9. Control of Pollutants will be done by providing a down-turned elbow in the <br /> driveway catch basin. As this residential driveway is less than 2,000sf no <br /> additional measures are needed. <br /> 10. Control of Dewatering is not required on this project as no groundwater is <br /> expected to be encountered. <br /> 11. Maintain BMP's will be done by the owner. BMP's will be removed within 30 <br /> days of the site being stabilized. <br /> 12. Manage the Project will be done by the Owner. He will inspect and monitor the <br /> effectiveness of the BMP's to insure that no problems occur. <br /> Section 2 Project Description: The 11,098sf(0.255+/- acre) site is located on the north <br /> side of Lowel Road between the gravel alley and the Pacific Northwest Traction <br /> Company Right of Way(Substation). The site is currently vacant with some ivy,trees <br /> and brush. There is no storm drainage in the area. The site slopes down to the northeast at <br /> 20 to 40%+/-. Storm water runoff currently sheet flows off of the vacant site to the PNW <br /> Traction Company ROW, or infiltrates on site. See attached site map. The flow will <br /> continue to flow to the northeast as it now does but infiltration trenches will be installed <br />