My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1802 75TH ST SW 2019-01-30
>
Address Records
>
75TH ST SW
>
1802
>
1802 75TH ST SW 2019-01-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2019 11:32:08 AM
Creation date
1/30/2019 10:43:09 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1802
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aii <br /> Ii3ii 0 <br /> PUBLI Date: 8/ 0 6 <br /> C ORKS PERMIT Public Works Permit#: PW1608-006 <br /> City of Everett Public Works Department <br /> -- 3200 Cedar Street Parent Permit#: B1606-037 <br /> Everett, WA 98201 Planning Reference#: <br /> (425) 257-8810 <br /> Public Works Fee$: $ 1,970.75 <br /> Other$: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> PUBLIC UTILITY DIST 1 SNO CO LEE KIM <br /> 2320 CALIFORNIA <br /> EVERETT WA 98201 <br /> PHONE: PHONE: 4257838452 <br /> TAX PARCEL ID# 00392200000300 SITE ADDRESS: 1802 75TH ST SW <br /> SITE WORK REMODEL/TI-SNOH CO PUD <br /> LY WHN 20THAVE W <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works <br /> Department dated 09/07/2016. w <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior <br /> to starting construction and with other inspection requests. [tel <br /> 6. Install erosion control measures per City of Everett Standards and remove upon <br /> completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto <br /> roadway. O <br /> 8. All work shall be performed in accordance with the City of Everett's current Design <br /> and Construction Standards and Specifications for Development. ft <br /> Public Works Permit Fee Breakdown: <br /> Erosion Control Plans-CommerciaVlndust.) $200.00 <br /> Parkin Lot Paving(7,000SQFT) $45.00 �..1 <br /> PW Plan Review $575.25 Up <br /> PW Site Inspection $1,150.50 O <br /> a <br /> ' ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> F <br /> ',�� City of Everett from any and all claims for damages,costs,expenses,or <br /> rAmo - Z- Air ' causes of action that may arise because of installation and maintenance of the <br /> �r• improvement or other right-of-way use hereto applied for and further agrees to <br /> p• OVe% for COr1StrU / Date/ remove same upon notice from the City and to replace public property <br /> le '12--` damaged thereby. <br /> Fl AL INSPEr Ir"' Date - <br /> Approved as Constructed <br /> pp )ign re Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY <br /> YUUPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.