Laserfiche WebLink
INSPECTION REPORT <br /> Date k9_I Permit: C ►lU\•• 10ZA <br /> Contractor: ` \* (o Q+t, <br /> Owner: t Fi aka <br /> Site Address: 2--Ci lAl.) _q <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final Shear Nailing GAS PIPE <br /> SITE WORK Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final HWT Fi. <br /> OTHER OR CONSULTATION: 0-7 <br /> ❑ APPROVAL [L P tALAPPROVAL FINAL APPROVAL THI - - T <br /> ❑ OK FOR T.C.O. [CORRECTION REQUESTED El <br /> OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> • L(425)257-8881,FO: REINSPECTION-24 hour notice re ireft6. <br /> A "--;r1 Ell Al 5 T. 6 41,f` ' — <br /> t i' S " _ � � dc.) <br /> y <br /> (.:_., \ <br /> ,Y)sl- • zt? - 2 <br /> 7Z72 id& S C' 2 <br /> Inspector: 'Ct , �- Date: 3` lq-fir/ <br /> EIR(10/06)- DATABAR,INC. <br />