Laserfiche WebLink
. INSPECTION REPORT <br /> � 7‘ - <br /> Date 31A4(g Permit: 6t g"03- f s-6o <br /> Contractor: J that-S.f_ etec <br /> (1, <br /> .2.- Owner: St/lt; V ( i_______ <br /> Site Address: Q 3D o ca se a__&... b � tt -T-� <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building FFiinnall ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: YS O <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> rlJAJABLE TO PERFORM INSPECTION: . _ ___ <br /> ❑❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> �y <br /> N6 f1.e. 6/ 71 c._ r4i\ 0A-1 <br /> i c74-e-- <br /> Inspector: Date: - —°2-----/'----i° <br /> EIR(10/06) DATABAR,INC. <br />