Laserfiche WebLink
INSPECTION REPORT <br /> ‘'' Date__11/30Permit: j loll-10__ <br /> - Contractor: __ __ ____MiaLaigreLt <br /> ___ <br /> Owner: e 0 i is ,i I <br /> Site Address: 91-15 _ l -_a <br /> TYPE OF INSPECTION REQUESTED <br /> J <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building F'- I A„El pas Pige Final ❑HWT Final <br /> 2 OTHER OR CONSULTATION: i9 . 3-1 — 0 ` 2 2,5 <br /> ❑ APPROVAL P AL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. CORRECTION REQUESTED El <br /> OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> ' /6 " `-C �"l011z Ac1 N 770 _ <br /> �6R +z ' C�,ofd At Req , S ,- /J <br /> 2 -- 7 r2-AiS i <br /> `—CU�� <br /> r) <br /> Inspector: Date: 1 2-- — 3 —7g <br /> EIR(10/06) DATABAR,INC. <br />