Laserfiche WebLink
t- 02 <br /> INSPECTION REPORT % <br /> Date ‘21 _,3 Permit: e 'R 2 -auks <br /> Contractor: 6. 2f-e X-- _ , <br /> Owner: <br /> Site Address: go..-4 q.....4.1eArtycn CILL4n_ <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/ onduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> • '. gh In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> kl Service ❑Framing ❑Rooftop Units ❑Water Service <br /> •Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building' ' FinalFi2 ❑Gas Pipe Finalg ❑HWT Final ,/�_ <br /> OTHER OR CONSULTATION:42S 353 (q 1 t1 Dbe.-(_ l � <br /> L ❑ PARTIAL APPROVAL FINAL APPROVi T <br /> ❑ OK FOR T.C.O. ET—CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION41K. <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> / <br /> Inspector: /�� " Date: 3 / ? <br /> EIR(10/06) �,/�' DATABAR,INC. <br />