Laserfiche WebLink
To:June DeVoll<June.DeVoll@commtrans.org> <br /> Subject:Swift Operations Contact <br /> June, <br /> I'm reviewing a traffic control plan for a contractor working for the City of Everett on a water line replacement. They <br /> need to do some exploratory drilling on Evergreen Way south of Casino Road that will likely affect service to the NB <br /> Swift stop there. I am requiring the contractor to coordinate the work with CT to minimize the impact to the Swift line <br /> and I'm not sure who to provide as a contact with CT. Would you please help point me to the correct person? <br /> Thank you very much for your help, <br /> Michael Brick, P.E. <br /> Associate Traffic Engineer <br /> City of Everett Public Works <br /> (425)257-7790 <br />