Laserfiche WebLink
INSPECTION REPORT <br /> AI 1 ` ,.1 <br /> i Date V� I� Permit: J l�I 0-1st4 <br /> Contractor: <br /> .13A tit -. <br /> .aiyiAL...----N <br /> �` <br /> _ TtJlA Owner: V orUI"V S AWr <br /> ed <br /> Site Address:_ ' atA 1 ° <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL ‘ BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> Ceiling Grid ❑Drywall Nailing ID Plumbing Final <br /> ! Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> /6)PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS RMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> 6)(C ,,-.... <br /> aUCfrL <br /> Inspector: /(Z----.. Date: (L ( = <br /> EIR(10/06) DATABAR,INC. <br />