Laserfiche WebLink
Permit#: B1805-045 <br /> Site Address: 8530 EVERGREEN WAY <br /> ABBREVIATIC�NS GENERAL NC)TES <br /> � � Owner: WA MUTUAL/M V&P <br /> Tenant: FREQ MEYER <br /> 1. ALL WORK TO COMPLY WITH THE REQUIREMENTS OF THE CITY OF EVEREIT, WA AND THE CURRENT �pITIQN OF THE 2015 INTERNATIONAL BUIL[}ING CODE. ] � App.Date: 5/29/Z018 <br /> ANY BUILDING OFFICIAL, SUBCONTRACTOR OR TRADES PERSON NOTING DISCREPANCIES SHALL NOTIFY THE DESIGNER AND FRED MEYER IMMEDIATELY UPON Praposed Use: COMMERCIAL <br /> < ANGLE ID INSIDE DIAMETER (DIM.) DISCOVERY. <br /> ' Description: TITOCONSTRUCTCUCKLISTAREA <br /> U AT INSUL INSULATION 2. CONTRACTORS SHALL COORDINATE ALL REQUIRED iNSPECTIdNS WITH THE CITY OF EVERETT AND ANY OTHER GOVERNING AUTHORITIES AS REQUIRED. � '`"`_�`� h .�,a.�.,,��� <br /> + AND INT INTERIOR Reviewed By: "� ��t�= �J� <br /> RB ANCNOR BOLT INV INVERT 3. COt�TRACTORS SHALL VERIFY AND CQNFIRM EXISTING CONDITIONS AS SHOWN OR fMP�IED dN DRAWINGS PRIOR TO THE START OF CONSTRUCTION QR _-' <br /> IPS IRON PIPE SIZE ORDERING MATERIA�S, ND N071FY THE DESIGlVER OF ANY DISCREPANCIES. � 3 - =office Set �ab Site Set Fire/Planning Set <br /> A/C AIR CONDITIONING JAN JANITOR R ��������� �������'��' ���� <br /> ACT RCOUSTICAL CEILING TILE JT JOINT 4. CONTRACTORS SHALL OBTAIN AND PAY FOR ALL TEMPORARY UTILITIES INCLUDING ELECTRICITY NECESSARY FOR CO�ISTRUCTIQN. � ,�DETECTIOW �����II �Eq��R��. <br /> ACOUS ACOUSTICAL <br /> , <br /> 5. ALL CONSTRUCTION DEBRIS TO BE NEATLY STOCKPILED ON SITE tJNTIL DISPOSAL. ALL DEBRIS IS TO BE DISPOSED OF IN A LEGAL MANNER AT A '� E CO M M �L I C K L I ST RE M 0 D E L <br /> ADD ADDEN�DUM K TT KIOTICHEN ;__.. _ _ w SUP`�RViSED AUTOMATIC� <br /> ADJ ADJACENT KD KLIN DRIED IANDFILL aR RECYCLING CENTER. NO DEBRIS IS TO BE DISPOSED dF IN �OCAL WASTE COLLECTION FACILITIES. � <br /> � SPt��[�KLER �5�� ��� ¢{�:�::: <br /> ADJT ADJUSTAB�E L LENGTH �, CONTRACTOR SHALL INFORM FRED MEYER OF ANY AND ALL REQIJESTED CHANGE5. CONTRACTOR SHAL� NOT PROCEED WITH REQUESTED CHANGES OR F�a4 <br /> A.F.F. ABOVE FINISH FLOOR �g LABORATORY � <br /> AGG AGGREGATE �M IAMiNATE DIREC7IVES WITHOUT PREOR AUTHORIZATION FROM FRED MEYER ANd A WRITiEN GHANGE ORDER. CLIVK LIST PROJECT DES'1✓f�IPTIQIV. <br /> ALS AREALIGHTSTANDARD �V LAVATORY 7. CONTRACTOR SHALL PROVIDE STORAGE FOR ALL BUILDING MATERIALS IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS. �'�` `RKS p�p a <br /> ALT ALTERNATE LB LAG BOLT 'y i ����: � <br /> ANOD ANODIZED LDW �ESS DOOR WIDTH 8 SUBSTT�UTIONT�ONQUESTIONg�NCLUDI�NG�COSTTHE OWNER, ALONG WITH WRITTEN REQUESTS CONTRACTOR SHALL PROVIDE ALL INF�RMATION REGARDING THE THIS PRO�ECT CONSI�7T�7 OF �REATINV A �EYY JTAVI�V A�E/"► I� AN E�TRY VESTIDULE IN�IDE THE EXISTIN� FRE� IVIEYEf� GROCERY STORE. ONLI�E GR�CERY � ` � <br /> LI. LANDSCAPE ISLAND <br /> APPROX APPROXIMATE LKR LOCKER 3� ''� �I�,.i,p <br /> ,.r;.x <br /> ARCH ARCHITECTURA� LL LIVE LOAD 9. C4NTRACTOR SHALL PROVIDE SAMPLES OF FINISHE� AND STAIN COLdRS FOR APPROVAL BY FRED MEYER. THIS INCLUDES, BUT IS NOT LIMITED T0, <br /> �RDERS WILL BE RECEIVED AND PROCES�ED IN THIS AREA. THE NEW AREA WILL HAVE A WALK-IN CQ4LER & REACH-IN FREEZERS AND L4W PLASTIC PALLET ��'� ,��_ 'F" m <br /> AUTO AUTpMATIC LS LANDSCAPING INTERIOR ANC3 EXTERIOR PAINT, SHEET ROCK TEXTURES AND FLOOR FINISH. �� <br /> A.F.C. ABOVE FINISH CEILiNG LVR LOUVER 10. WRITfEN DIMENSIONS AND NC7TES ON DRAWING SHALL TAKE PRIORITY OVER SCALE OF DRAWINGS. DO NOT MEASURE DRAWINGS TO DEfERMINE ANY RACKS T� PLACE PLASTIC TOTES THAT HOLD THE CUST�MER'S ORDER. THIS I� AN EMPLOYEE CJNLY AREA NO CUSTOMEF�S AF�E ALL�VUED. IN THE PARKING LOT o <br /> BC BOTTOM OF CURB � a <br /> BD BOARD MAT'L MATERIAL DIMENSIONS. DRAWINGS ARE IN SCALE FC1R PURPOSES OF DESIGN AND INTENT ONLY. ALL DIMENSIflNS ARE TO ANQ FROM THE �INISHED FACE OF WAL� g PARKING SPACES WILL BE IDENTlFIED AS CLICKLIST CUST4MER PARKING WITH STRIPING AND SIGNAGE. <br /> B.F.F. BELOW FINISH FLOOf� MAX MAXIMUM UNLESS OTHERWISE NOTED. o <br /> BITUM BITUMINOUS MB MACNINE BOLT <br /> BLDG BUILDING MC MINERAL CORE 11. ALL FEATURES OF THE WORK NOT FULLY SHOWN SHALL BE QF THE SAME lYPE AND CHARACTER UF TNAT SHOWN FOR SIMILAR CONDITIONS. IN THE <br /> BLK BLOCK MDO MEDiUM DENSITY OVERLAY EVENT OF THAT ADDITIpNA� WORK IS REQUIRED TO COMPLETE THE WORK AS INTENDED OR REQUIRED BY GOVERNING CODES, YEf NOT �ULLY SHOWN OR <br /> BLKG BLOCKING MECH MECHANICAL QMIITED BY IN THE DRAWINGS, CONTRACTORS MUST STILL PROVIDE FOUNDATION, CARPENTRY, MECHANICAL, ELECTRICAL AND QRj PLUMBING AS REQUIRED <br /> B.M. BENCH MARK MED MEDIUM <br /> FOR CERTIFICATE OF OCCUPANCY, - � <br /> B4O. BOTTOM OF... MEMB MEMEBI�ANE SITE VICINITY MAP � - PR�JECT TEAM PRUJE�T DATA <br /> BOT BOTfOM MEZZ MEZZANINE 12. VERIFY ALL DIMENSIONS AND MFR. SPECIFICATIQNS OF OWNER FURNiSNED EQUIPMENT PRIOR TO CONSTRUCTION. ��==� <br /> BRG BEARING MFR MANUFACTURER <br /> B.S. BOTH SIDES MH MANNOLE 13. DO NOT SGALE DRAWINGS. CLIENT: FRED MEYER JOB NAME: E COMM CLiCKLIST <br /> BSMT BASEMENT MI MAI�EABI.E IRON <br /> BTWN BETWEEN MIN MINIMUM 3800 SE 22nd AVENUE PROJECT LOCATION: 853Q EVERGREEN WAY <br /> BUR BUILT-UP RO�F MR MIRROR �ENERAL CONTRACTQR NOTES <br /> BPN! BED PAN WASHER MISC MISCELLANEOUS PORTLAND, OR 97219 EVEREIT WA 98208 <br /> MO MASONRY OPEMNG Ph. 503.797.3885 <br /> [ OR C CHANNEL CONTACT: TIM ANDERSON AREA OF INTERIOR REMODEL: W <br /> CAB CABINET MT�L METAL ED 1. GENERAL CONTRACTOR'S AND GENERA� CONTRACTO(�'S SUB-CONTRACTOR'S ARE RESPflNSIBLE FOR PAYING FOR TRADE PERMITS AS REQUIRED. : - , NEW CLICKLIST AREA: 553 S.F. <br /> CB CATCH BASIN V �} <br /> _; ; ,,; r=� <br /> MULL MULLION 2. GENERAL CONTRACTOR fS STRONGLY ENCOURAGED TO WALK JOB SITE PRIOR TO BIDDING. L =_ .-,: }; -,��<r • -„ •t�� •4 `` �� ° W <br /> d_�- OCCUPANCY. EXISTING M RETAIL --� ;�f�s�� r <br /> CEM CEMENT MEDCAB MEDiCAL CA8INET � ' `" � �' " " ARCHITECT OF RECORD: BARGHAUSEN CONSU�TING ENGINEERS, INC t ) ,�1J���� v �� � 't��;, ��,;. � <br /> CF CONTRACTOR FURNISHED � NORTN 3. G.C. TO PROVIDE AND INSTALI. ALL LIGHT FIXTURES �- 18215 72nd AVENUE SOUTH PROPOSED (M) RETAIL STORAGE y; �;���„� ��K;� �,���,���� =t�� � � .=Y �` <br /> " ��: .; , . r� ��;� �"� �' ._:; <br /> AND INSTALLED U} <br /> �J A N O T A P P L I C A B L E KENT, WA 98032 OCCUPANT LOAD: 2 (553/300) <br /> CG CORMER GUARD �� a <br /> i : <br /> C.I. CONTRACTOR INSTALLED ONLY NAT NATURAL 4, G.C. TO SUPPLY AND INSTALL THE AIR CURTAIN ABOVE TNE DOOR (WHERE REQUIRED) .-:a � Ph. 425.251.6222 � <br /> CI CAST IRON N/C NOT IN CONTRACT �� CONSTRUCTION TYPE: V-B (ASSUMED} W <br /> CLG CEILING N0. OR # NUMBER 5. G.C. TO PROVIDE POWER TO PRODUCE AREA FOR A PR�DUCE SCALE, LOCATION SELECTED BY FRED ME`(ER. A SECOND PRODUCE SCALE LOCATED I�J THE �,�,,� CONTACT: QANIEL GOALWIN >, <br /> C�OS CLOSET NOM NOMINAL CLICK �1ST SPACE IS TO HAVE PQWER & DATA � �4 #`� � <br /> CLR CLEAR NS NELSON STUQ � E: dgaalwinC�barghausen.com FIRE SPRINKLERS: YES � <br /> CJ CONTROL JOINT NTS NOT TO SCALE 6. G.C. TO PROVIDE PARKING LOT BOLLARDS AND PYRAMID SIGN BASES AS SHOWN ON AS1.1 & AS1.2 � - � � ` ` ���� U <br /> CMU CONCRETE MASONRY UNIT NIS NOT IN SHELL ISSUE £ s , ` �' � ;�``' _ STRUCTURAL ENGINEER: KRAMER GEHLEN ASSQCIATES FIRE A�ARM: YES <br /> COL COLUMN OA OVERALL 7. G.C. RESPONSIBLE TO REVIEW F1 DRAWINGS FROM KROGER AND INCORPORATE THEIR N�TES INTO THE BID 400 COLUMBIA ST. SUITE 240 <br /> COMP CdMPOSITION OBS 08SCURE � EXIT RE4UIREMENTS: 1 REQUIRED <br /> CQNC CQNCRETE OC ON CENTER 8. G.C. RESPt}�ISIBLE Td RELOCATE EXISTING DEPARTMENT SIGNS AND LIGHTS. G.C. TO MOVE ALL TRIM, WAfNSCOTTING AND ACCESSQRIES AS WELL. THE - � � > �-` VANCOUVER, WA 98660 2 PROVIDED <br /> CO CONCRETE OPENING OD OUTSIDE DIAMETER G.C. IS RESPONSIBLE TO RE�OCATE POWER AS NEEDED. Ph. 360.693.1521 <br /> CONN CONNECTION O.F. 4WNER FURMSHED CONTACT: COLLIN BUNDY <br /> CONST CONSTRUCTiON O.F.C.I. OWNER FURNISHED 9. G.C. RESPONSIBLE TO PROVIDE STORE SIDE FINISHES ON ALL NEW WA�LS AND QPENINGS "� SC C�P E �F W�R K <br /> C4NT C4NTINl�OUS CONTRACTOR INSTALLED ;�� � E: collinb@kramer-gehlen.com <br /> CONTR CdNTRACT�R OFF OFFICE 10. WHEN SPECIAL INSPECTIONS ARE REQUIREp, BY THE MUNIGIPALITY, G.C. TO SCHEDULE INSPECTI4NS. FRED M�1`ER WI�L PAY FOR COST OF INSPECTIONS ri. ��� <br /> CORR CORRIDOR OH OVERHEAD '�� ' � '- ' `` �� � ��-- ° � �=� #����`�� � �� � � �� � �� ' MECHANIGAL, ELEC�RICAL <br /> CR CONTRACTQR ROUGH-IN OPNG OPENING 11. G.C. RESPONSIBLE FOR PROVIQING POWER ANQ LOW VOLTAGE FQR ALL NEW SLIDING QOORS BEING I�ISTALLED. TENANT IMPROVEMENTS TO THE EXISTIf�G STORE CONSISTING, BUT NOT <br /> P�UMBING ENGWEER: ECI ENGINEERING CONSULTANTS, INC. LIMITED T0: '�'� <br /> CRRR CONTRACTOR REMOVED, OPP OPPOSITE <br /> RELOCATED + REINSTALLED OS OUTSIDE 12. G.C. IS TO PROVIDE CRANE FOR INSTALLAT{ON 0� NEW ROOF TOP MECHANICAL UNIT IF �JEEDED. }� 303 SOUTN FEDERAL WAY '� <br /> FLOOR AND WALL MODIFICATIDNS I- <br /> CS COUNTERSUNK OFI OWNER FURI�ISHED + :�� ` BOISE, ID 83705 <br /> INSTALtATlON OF WALK-IN COOLER <br /> CS.J C(�f�STRUCTION JOINT INSTA�LED 13. THE G.C. IS RESPONSIBLE TO PROVIDE ALL FIRE SPRINKLER WORK. NEW FIRE SPRINK�ER HEADS, NEW SUPPLY RUNS, RAISING OR LOWERING OF HEA[3S, �' Ph. 208.376.9820 INSTALLATION OF REACH-IN FREEZERS <br /> CSMT CASEMENT PAR PATALLEL NEW HEADS IN COOLERS AND/OR FR�EZERS, ETC. , �'� NEW INTERIOR WALL FINISHES AND PAINTING <br /> CT CERAMIC TILE PC PRECAST � '- '�`° ' �° -�" CONTACT: SHANE JENSEN <br /> u,k 9` LIGHTING AND ELECTRICAL MODIFICATlON <br /> CTR CENTER PIP POURED IN PLACE 14. THE G.C. fS RESPONSIBLE TO PROVIDE ELECTRICAL SAFE OFF AND THE RELOCATION OF POWER FOR FIXTURE MOVING. THIS INCLUDES DATA AND POWER E: shane�eciboise.com PARKING MODIFICATIONS AND NEW PAUEMENT MARKWGS <br /> CL CENT�R LINE PJ PANEL JOINT FOR TEMPORARY LOCATIONS OF EQUIPMENT BY FRED MEYER. <br /> CW COLO WATER PL PROPERTY �INE CONTRACTOR: TBD A P P L I CA B�E C C}D E S <br /> DBL �OUBLE P.LAM PLASTIC LAMiNATE 15. G.C. TO PROVIDE POWER TO THE PRODUCE AREA FOR A PRODUCE SCALE. LdCATION SELECTED BY FRED MEYER. <br /> DEMO DEMOLISN PIAS PLASTER <br /> DEPT �EPARTMENT PLYWD PLYWOOD 16. HVAC MUST BE BALANCED AND THE REPORT MUST BE SUBMITTED T4 FRED MEYER ANO POSTED TO SITEFOLIO. <br /> DF DRINKING FOUNTAIN PR PAIR 2015 INTERNATIONAL BUILDING CODE WETH WASHWGTON STATE AMENDMENTS <br /> DIA DIAMETER PREFIN PREFINISHED 17. THE G.C. IS REQUIRED TO INCLUDE IN THEIR BID A�L NECESSARY REMOTE SENSORS WIRING ANO INSTALlATION FOR MECHANICAL EQUIPMENT. CONTRACT 2015 WASHWGTON STATE ENERGY CODE <br /> DIAG DIAGONAL PT PRESSURE TREATED WAEL AT WYTEK CONTRQLS (503) 780-7871 OR WAEL�WYTEKCONTROLS.COM. W � 2Q15 UNlFORM P�UMBING CODE <br /> DIM DIMENSION PTD PAPER TOWEL DISPENSER } r 2015 INTERNATIONAL MECHANICAL CODE � <br /> DISP DISPENSER PTDR COMBINATI0�1 PAPER T01MEl 18. THE G.C. IS TO PROVIDE TEMPORARY AND PERMANENT POWER AND DATA TO ALL FIXTURES THAT MOVE DURWG CLICKLIST CONSTRUCTION. SUMNER � � o � � 0 2015 INTERNATIONAL FIRE CODE � � „� O <br /> D.JT DEF�ECTION JOINT DISPENSER + REGEPTACLE z = � z = � 2017 NATIONAL ELECTRICAL CODE � � <br /> DL QEAD LOAD PTN PARTITION i ~ �' � ~ " 2d09 ICC/ANSI A1117.1 ACCESSIBILITY CODE O J <br /> DMT DEMOUNTABLE PTR PAPER TOWEL RECEPTACLE w w <br /> DN DO!NN PVC PO�YVINYL # � W � <br /> �o DOOR OPENING PVMT PAVEMENT RESPONSIBILITY SCHEaULE � � � � REMARKS RESPONSIBILITY SCHEDULE � � � � REMARKS (� W � <br /> DP DAMPROFFING QT QUARRY TILE � z � z LL z LL z � J � <br /> Q R D Q O R R R I S E R G E N E R A L C Q M M E N T S - - - J U R I S D I C T I 4 N w � <br /> os DOWNSPOUT R. RADIUS GENERA� CONDITIONS F1IVISHES � (� � <br /> DSP dRY STANDPIPE RA RETURN AIR BUILDING PERMITS AND FEES • � ACOUSTICAL CEILING/ TBAR NON� � <br /> DT DRAIN TILE RB RUBBER BASE 1. CONTRACTOR TO MAINTAIN COMPLEfE TOP UALITY "AS-BUILT" DRAWINGS FOR SUBMITTAL TO FRED MEYER UPON JOB COMPLE�ION. PROGRESSIVE AND FINAL CLEAN UP � � CONCRETE SEALANT ALL FLOORS � � SEE SPEC CIIY OF EVERETT BUILDING DEPT. > � � � <br /> DT� DETAIL RD ROOF DRAIN Q SPECIAL INSPECTIONS • • PAI[7 BY FRED MEYER WALL BASE Bl�4CK RUBBER BASE • � ALL WALLS �N CLICK LIST 3200 CEDAR ST. W � W W <br /> DWG DRAWING REF REFERENCE EVERETT, WA 98201 <br /> 0 DIAMETER OR ROUND REFL REFLECTED 2. VERiFY ALL CONDITIONS IN THE FIELD. GYPSUM BOARD TEXTURE � � ALL PATCHES AND NEW O <br /> SITEWC�RK AND DEMO 1/2" P�YW000 OR OSB ON WALLS � � SEE DRAWINGS (425) 257-8810 � ♦ , Q � <br /> E EAST REFR REFRIGERATOR �,�! ('� <br /> EA EACN REINF REINFORCED 3. A�L MEP QRAWINGS REQUIRE FINA� REVIEW BY FRED MEYER. HAZ-MAT ABATEMENT NONE PAINTING - EXTERIOR � � AS NEEDED SNOHOMISN NEALTH QISTRICT u- W �.«�,� � <br /> EF EACH FACE RESIL RESIUENT DEMOLITION - SITE • • PA{NTING - INTERIOR � � ALL NEW AND £XISTWG WALLS 3020 RUCKER AVE. <br /> E.AGG EXPOSED AGGREGATE REQ'D REQUIRED DEM��ITI4iV - BLDG. • • STflRE FINISHES i � EVERETT, WA 9$201 <br /> 4. COVER REfURN AIR OPENINGS BEFORE AND DURING CONSTRUCTION. <br /> EJ EXPANSION JOINT REV REVIS� OR REVISIDN DEMO�ITION - ROQF NONE (425) 339-5200 <br /> ELEC ELECTRICAL RM ROOM <br /> ELEV E�EVATOR RO ROUGH OPENING 5. ALL ROOF WORK MUST BE DONE BY FRED MEYERS APPROVED ROOFING CONTRACTOR. FIRE E�ITING • SPECIALITIES <br /> E{�S EDGE OF SLAB RWL RAIN WATER LEADER EQUfPMENT REMOVAL NONE AWNINGSj CANOPIES NONE <br /> ENCL ENCLOSURE RCP REFLECTED GEI�ING PLAN 6. ALL CHANGES TO THE DESIGN AFTER OWNER'� APPROVAL SHALL BE APPROVED IN WRITING BY FRED MEYER. FENCING, TEMPORARY � � AS NEEDED FIRE EXTiNGUISHERS � � D E F E R R E D S U B M ITTALS BY G■�■ � <br /> ENGR ENGINEER S SOUTH LANDSCAPING AND ISLANDS NONE SHELVING AND CABINETS • ! <br /> EP ELECTRICAL PANEL SC SO�ID CORE 7, ANY PENETRATIONS OR MODiFICATI4NS TO THE STRUCTURE NOT SHOWN IN TNE DRAWINGS MUST BE C04RDINATEQ WITN THE OWNER AND STRUCTURA PARKING PAVING & IMPROVEMENTS � � AS NEEDED SHE�F FOR CONDENSATE PUMP NONE (L <br /> EQ EQUAL SCD SEAT COVER DISPENSER FIRE ALARM MQDIFICATIONS <br /> EQUIP EQUIPMENT SCHED SCHEDULE ENGINEER. PARKING STRIPING � � AS SHOWN <br /> ES EACH SIDE SD SOAP DISPENSER NEW DOOR OPENING � � MODIFY EXISTING PLUMBtNG FIRE SPRINKLER MODIFICATIONS <br /> EW EACH WAY SECT SECTION 8. PROVIDE TEMPORARY CONSTRUCTION BARRIERS PRIOR TO THE START OF CONSTRUCTIdN. DO NOT OBSTRUCT ANY EGRESS EXITS. DAMAGE TO EXIST(N FLOOR DRAINS NONE � �� <br /> EDF E�ECTRIC DRINKING FOUNTAIN SGE SEMi-GLOSS ENAME� FINISHES IS TO BE REPAIRE� AT THE GENERAL CQNTRACTOR'S EXPENSE. GONCRETE HUB DRAINS NONE � REGISTERF d <br /> EXfST EXISTING SH SHELF CONCRETE FREEZER SLAB NONE RdUGH-IN AND DEMO NONE �` �RCHITECI <br /> EXP EXPANSION SHTG SHEATHING g, PRIOR TO THE START OF WORK THE GENERAL CONTRACTOR IS TO HAVE A KICK-OFF MEETING WITH OWNER'S REPRESENTATIVES AND CITY INSPECTdR FL40RING GRINQI�JG � � AS NEEDED RE�OCAT�D FIXTURES NONE B I D D E R D ES I G N F I R E <br /> EXT EXTERIQR SHWR SHOWER D IEL B GOA `, <br /> FA FIRE ALARM SHT SHEET WHERE REQUIRED. PouReACKs, PATCHiPIG J PLUM8ING TRENCHES � � HOT WATER NONE <br /> FAST FASTENER SIM SIMILRR STRUCTURAL CONCRETE NONE CONDENSATE LINES NONE S P R I N KLE R C R ITE R IA ; ST T� OF ' INGTQN <br /> FB FIAT BAR SJ SEl5MIC JOlNT 10. AL� MATERIALS USED IN THE CONSTRUCTION OF THIS PROJECT ARE TO BE ASBESTOS FREE. FENCE POSTS NONE ' <br /> FBO FURNISHED BY OTHERS SL SLIDING <br /> FQ FLOOR DRAIN SM SNEEi METAL EQUIPMENT <br /> FDN FQUNDATION SND SANITARY NAPKIN OISPENSER 11. SUBMIT MATERIAL SAMP�ES FOR APPRC7VAL. MASONRY EXTERIOR SIGNAGE � � PARKING AND DIRECTIONAL SIGNS 1. A�L SPRINKLER WORK SHALL BE PROVIDEd UNDER GC'S CONTRACT. 7CF': �'J811�5/18 <br /> FE FIRE EXTINGUISHER SNT SANITARY NAPKIM RECEPTACLE CMU f BRICK / MISC. NONE REFRIG. - FREEZER REACH-IN � � GC TQ PROVIDE PERMIT. SUBMITTALS SHALL BE DEFERRED. <br /> FEC FIRE EXTINGUISHER CABINET SPEC SPECIFICATION 12. A�L FLOOR CUTOUTS ARE TO BE POURED BACK SMOOTM ANQ LEVEL. IN AREAS V�HERE THE �LOOR IS STAINED AND SEALED MATGH THE EXISTIN PRECAST CURBS - WHEE� STOPS • � REFRIG. - REACH-IN COOLER • � <br /> F�' FINISH FLOOR SQ SQUARE CQLOR ANp FINISH. POS SYSTEM DATA LINK � � GC TO PROVIDE ALL POY4ER AND CONDU 2. IT IS THE DESIGN/BUILD CONTRACTORS RESPONSIBILITY TO CONFORM TO ALL o <br /> FHC FIRE HOSE CABINEI� SS STAINLESS STEEL APPLICABLE BUILDING CODES AND TQ PROVIDE A�L DOCUMENTATION REQUIRED � N i � � i <br /> FIN FINISH S + V STAIN + VARNI5H „ METALS AIR CURTAIN NONE TO OBTAIN PERMITS FQR WORK UNDER THEIR CONTRACT. v, '� v <br /> 13. TOP OF WALL DEFLECTION TRACK TO ALLOW A MIN. OF 2 MOVEMENT BETWEEN BOTTdM OF R�OF TRUSS AND TOP OF WA�L. FIRST SCREW ON TH BOLLARDS � • � > � <br /> FL FLOOR STA STATION = i <br /> FIASH FLASHING STD STANDARQ WALLBOARD IS TO BE 8" BELOW T4P OF WALL. CARPENTRY - EXTERIOR METALS � � AS NEEOED MECHANICAL 3. THE OWNER AND DESIGNER ARE NOT RESPONSIBLE FdR ADDITIONAL CdSTS "' <br /> FLUOR FLUORESCENT STK STOCK CARPENTRY - lNTERIOR METALS • • AS NEEDED REMOTE HVAC SENSOR � � CONTACT WAEL AT VYYTEK � <br /> CONTRO�S FOR PRiCING INCURRED DUE TO DESIGN/BUILD CONTRACTORS ERROR AND OMISSIONS. � � ^� x <br /> FO FACE OF ST� STEEL � � � <br /> COLD F�RMED META� FRAMING WA�LS � � 503 78o-�s71 �, �„ � i�, <br /> FOC FACE OF CONCRETE STOR STORAGE � � <br /> FOM FACE OF MASONRY SUSP SUSPENDED CORNER GUARDS NONE CQMPRESSORS & CONDENSERS � � AND FIRE ALARM SYSTEMS WHETHER MODIFICATIONS TO THE EXISTING SYSTEM � � > � � <br /> FOF FACE OF FINISN STRUCT STRUCTURAL E LELTR I VAL V�ITE R I� 4. GC IS RESPONSIBLE FOR ALL WORK ASSOCIATED WITH THE FIRE SPRINKLER � � � � <br /> METAL DECK NONE CONDENSERS SUPPORT AND SLEEPERS � � oi <br /> FOS FACE OF STUD SYM SYMMETRICAL METAL RAI�INGS NONE CONDENSERS SEISMIC ATTACNMENT � � OR ANY NEW SYSTEM. '� v � a °% � <br /> FOTS FACE OF TUBE SECTION SYST SYSTEM 1. ELECTRICAL CONTRACTOR WILL COORDINATE POWER, SIGNAL AND LIGHTING DESiGN AND PR{�VIDE CALCULATIONS IN CONFORMANCE WITH STATE ELECTRICAL STEEL - MISCELLANE011S � � CONDENSER PLATFORM/CURBS � � o o � Q o � <br /> FRT FIRE RETARDANT TREATED T TREAD CODE, ENERGY CODE AND BUILDING CODE. STEEL - STRUCTURAL � � HVAC - INTERIOR DISTRIBUTION • • SEE MECHANICAL DRAWING5 <br /> F7 FOOT OR FEET TB TOWEL BAR STEEL - NEW OPENING FRAMES � « PLUMBING LINE FOR CONDENSATE • � NONE E N E R GY C O M P LI A�1�E N OTE� � <br /> �IG FOOTING T + B TOP AND BOTTOM 2, ELECTRICA� C4NTRACTOR WILL REVIEW THE PRQGRAM DRAWING AND WILL MEET WITH FRED MEYER TO FINA�lZE THE EXACT POWER LOCATI4NS AND FIRE SPRINKI.�RS � � MODIFY EXISTING � <br /> FURR FURRiNG TOC TOP OF CURB � <br /> GA GAUGE TEL TELEPHONE REQUIREMENTS FOR EQUIPMENT. PROVIDE CODE REQUIRED AND M,4INTENANCE RECEPTACLES. I�lCLUDE FIRE ALARM SYSTEM IF REQUIRED, COORDINATED WOODS AND PLASTICS INSTALL REFER. EQUIP ON ROOF NONE �;, <br /> GALV GA�VANIZED TEMP TEMPERED AND EXTENDED FROM BUILDING FIRE ALARM SYSTEM. OUTLETS, PHONE AND DATA JACKS SHQWN ON PLANS (IF ANY) ARE �11NIMUM REQUIRED AND MAY CAF�PENTRY- EXTERIOR WOODS � • AS NEEDED SPLIT SYSTEM � � 1. ALL PENETRATIONS IN BUILDING ENUE�OPE ARE TO BE SEALEd. <br /> GB GRAB BAR T + G TONGUE AND GROOVE NOT 1NCLUDE ADDITIONAL OUTLETS REQUIRED BY CODE OR FOR MAINTENANCE. CARPENTRY- INT. WOODS PLASTICS � � AS NEEDED 4 <br /> GC GENERAL CONTRACTOR THK THICK 2. RECESSED LIGHTING IN THE BUILDING ENVELOPE MUST BE IC RATED MEET ASTM E283. v� �. <br /> FRAMING MATERIAL 8c SHEATHING • • AS NEEDED ELECTRICAL • • w ,�; <br /> GI GALVANIZED IRO�J TJ T00� JOINT = ca t� <br /> 3. ELECTRICAL CONTRACTOR WILL COORDI�IATE HIS !NORI{ WITH FRED MEYER, THE HVAC CONTRACTUR, REFRIGERATION CONTRACTOR, ALARM AND FIRE STRUCTURAL FRAMING � � AS NEEI7ED COMMUNICATIDNS (PHONE SYSTEM) 0 � CA6l�iNG AND CONDUITS QNLY F- z � � <br /> GL GLASS TP TOP OF PAVEMENT „ 3. A�L EXIT LIGHTS TO BE 5 WATTS MAX. � Z � � <br /> GL G�U LAM TPD TOILET PAPER DISPENSER SPRINKLER DESIGN/BUELD CONTRACTOR. WALL PROTECTION � • �/2 PLYWOOD OR OSB ELECTRICAL SERVICE / DISTRIBUTION � • p Z w .- <br /> GND GROUND TPD(S) SURFACE MOUNTED TOILET ENERGY MANAGEMENT SYSTEMS • � W °�- a � <br /> GP GA�VANIZEQ PIPE PAPER DISPENSER 4. ELECTRICAL CONTRACTOR WILL MEET WITH FRED MEYER TO DETERMINE AND/OR CONFIRM THE LOCATION OF ALL DATA AND COMMUNICATION CONNECTIQNS THERMAL AND MOISTURE PROTECTION FIRE ALARM SYSTEM • i D RAW I N G I N D EX x ~ <br /> GRD GRADE TS TUBE SECTION REQUIRED. CEMEF�TITI�US STUCCO NONE LIGHTING • f z d z w �i <br /> GVP GYPSUM VENEER PLASTER N TELEVISION EXT. INSULATION & FINISH SYSTEMS NONE SECURITY SYST-CCN & BURGLAR • � j N � � z � <br /> G W B G Y P S U M W A L L B O A R D T O W T O P O F W A L L <br /> GYP GYPSUM BOARD TYp TYPICAL 5. CONFIRM LIGHTING SWITCHING REQUIREMENTS WITH OWNER. ROOFING - PATCH NONE POWER TO C4CILER AND F'REEZER � � ARCHITECTURAI. `� o N � � � �. <br /> GA GAUGE UNFIN UNFINISHED CONQENSOR PLATFORM CURBS rvaNE CQOLER HEAT TRACE, TIMER AND NONE o °� N � � � °J <br /> T1.1 COVER SHEET z � � � w � o <br /> GALV GALVANIZED UR URINAL 6. CONSTRUCTI4N AND AS-BUILT ORAWINGS TO BE PROVIDED ON ELECTRQNIC MEDIA, AUTOCAD 2004 OR LATER, T4 THE OWNER FOR THE OWNER'S SHEET METAL FLASHING & CaPING NONE LIGHTS N I I w <br /> T1.2 EXITING PLAN <br /> GB GRAB BAR U/CUT UNDER CUT RECORQS. THERMAL INSULATION - WA��S NONE P01NER TO PRODUCE SCALE � � PRODUCE DEPARTMENT AS1.1 SITE PLAN �` � � � c� z 3 <br /> GC GENERAL CONTRACTOR U.N.�. UNLESS NOTED OTHERWISE cucKusr ,aREa AS1.2 CLICKLIST PARKING LAYOUT � N N z - -n <br /> GI GA�VANIZED IRON VB VAPOR BARRIER THERMAL INSULATION - ROOF NONE POWER & DATA TO PRODUCE SCALE • • � <br /> �� w � <br /> 7. ELECTRICAL CONTRACTOR SHALL BE f�ESPQNSIBLE TO VERIFY ALL DEVICES, INCLUDING BUT NOT LIMITED T0: STROBES, ANNUNCIATORS, AND EGRESS PC?WER & LQW VOLTAGE SLIDING DODR • � Ai.0 DEMOLITION FLOOR PLAN & REFLECTED CEILING PLAN � z � � J > <br /> GL GLASS VEi�T VERTfCAL LIGHTWG, REQUIRED BY ALL APPLiCABLE CODES. POWER AND LIGHTING DRAWlNGS INCLUDED IN THlS DOCUMENT ARE FOR DESIGN PURP4SES ONLY. A1.1 CONSTRUCTION F�OOR PLAN & REFLECTED CEILING PLAN oo w � � > � '- <br /> GL GLU lAM VEST VESTIBULE D O O R S A N D W I h I D O W S POWER T� PEM CASES � Y v,� � � h <br /> GND GR4UNQ ANY DEVICE REQUIREQ BY CODE OR BY BUILDING OFFICIAL AND NOT INCLUDED IN ELECTRICAL BASE BID SHALL BE INSTALLED AT THE ELECTRICAL DESIGN A1.2 FIXTURE PLAN o0 <br /> GP GALVANIZED PIPE V�1' VE�IFY DOORS- POWER TO 5ALE5 COUNTER � <br /> VG VERTICAL GRAIN CONTRACTOR'S EXPENSE. A1.3 FINISH PLAN �, <br /> GRD GRADE AUTOMATIC SYSTEM5 • � SLIDING DOOR POWER TQ THEF7' CON7ROL PEDESTALS A2.1 WALL SECTIONS & DETAILS � <br /> W WEST EXTERIOR • • MODIFY PER PLAN A2.2 EQUIPMENT DETAII.S .� <br /> GVP GYPSUM VENEER PLASTER � • - <br /> GW8 GYPSUM WALL BOARO W� WIQTH EXTERIOR FINISH • • SEA�ING AT NEW DOOR FIRE SPRINKLER AND ALARMS �� � x <br /> W/ WITH STRUCTURAL �'w h' `Sd.� c� <br /> GYP GYPSUM BOARD IM1JTERIdR ! • MODIFY PER PLAN FIRE SPRINKLER SYSTEM • • G.C. IS RESPONSIBLE FOR AlL DESIGN, �,� <br /> HB HOSE BIBB WC WATER CLOSET � � <br /> W.D. WINDOW DIMENSIO�J INTERIOR FINISH � • FIRE ALARMS SYSTEM � � PERMfTTING AND b10DIFICATIONS NEEDED S1 STRUCTURA� PLANS & DETAI�S ;,� .- <br /> HC HOLLOW CORE WD WOOD TRAFFIC IMPACT NONE Q =: -; = � � <br /> � o <br /> HC HANDI�AP PARKlNG STALL ELECTRICAL z - <br /> HDWD HARDWOOD WF WIDE FLANGE DOOR HARDWARE- NONE MISCELLANEOUS = = W � <br /> WG WIREGLASS E1.1 DEMO & NEW LIGHTING PLANS t7 � <br /> HDWR HARDWARE TRAFFIG IMPAGT FRAME NONE ADA COMPLIANCE • � <br /> HM HOLLOW METAL WH WATER HEATER TRAFFIC IMPACT HARDWARE NONE PROVIDE SIGN BO�LARDS � � E1.3 DEMO, NEW & ROOF POWER PLANS � �._ � <br /> WDW WINDOW E1.3.1 PANEL SCHEDULES AND DETAILS (� v � <br /> HORIZ HORIZ4NTAL INTERIaR DOdR HARDWARE • • MODIFY PER Pt�4N PYRAMID BASES • • � `� <br /> HR HOUR W/0 WITH OUT b► �5 � <br /> H. HEIGHT WP WATERPROOF S�IDlNG DOOR THRESHOLD • • GARDEN FENCE NONE MECHANICAL � � CO � <br /> WRB WEATHER RESISTANT BARRIER STOREFRONT GLAZING • • as sHow►v <br /> HVAC HEATING/VENTILATIONfAIR WRGB WATER RESISTANT GYPSUM M1.1 MECHANICAL PLAN � <br /> CONDITIONING WIND4W FlLM • As s�owN <br /> � : <br /> 0 <br /> � a T � � <br /> HW HOT WATER � � � <br /> WW WATERSTOP � <br /> WSCT WAINSCOT <br /> WT WEIGHT NOTE: THIS RESPt7NSIBILITY SCHEDULE MAY NOT IDENTIFY EVERY WORK ITEM OR EQUIPMENT REQUIRED FOR THE PROJECT. THE CONTRACTOR SHALL THOROUGHLY � O � � o i <br /> WWF WELDED WIRE FABRIC REVIEW THE DRAWINGS AND SPECIFICATIONS FOR THE FULL SCOPE OF WORK. � ,r,,.. a- <br /> � <br /> � <br />