My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB CONSTRUCTION INC. 6/23/2010
>
Contracts
>
Capital Contract
>
KLB CONSTRUCTION INC. 6/23/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:20:17 PM
Creation date
2/7/2019 12:15:48 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB CONSTRUCTION INC.
Approval Date
6/23/2010
Council Approval Date
6/2/2010
Department
Public Works
Department Project Manager
TIM MARKS
Subject / Project Title
Riverfront Surcharge Phase 3
Public Works WO Number
RD3316-32
Tracking Number
0001630
Total Compensation
$2,967,195.01
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. The City solely caused a delay to the Completion Date as measured by analysis of the <br /> project duration by the critical path method pursuant to section 5.2.2.2 Extensions of <br /> Contract Time; <br /> B. Because of the delay described in subsection (A), the Contractor was forced to suspend <br /> or significantly interrupt its performance so that it was on stand by or idled, and the City <br /> required the Contractor to be ready to resume performance on short notice. Extended <br /> time of performance of work, such as extensions caused by changes, inefficiencies, or <br /> extra work, does not constitute suspension or significant interruption of performance. <br /> C. The Contractor could not and did not use resources(labor, equipment, etc.) standing by <br /> or idled on this or any other project for any work during the period of delay; <br /> D. The Contractor's Overhead costs did not materially vary from its usual seasonal <br /> Overhead costs during the period of delay; and <br /> E. The delay did not cause Overabsorbed Overhead in the period in which the delayed work <br /> was completed. <br /> 12.4.3.5.2.1 Resources <br /> To demonstrate the Contractor could not and did not use resources (labor, equipment, etc.)from this <br /> project for any other work on this or any other project during the period of delay (section 12.4.3.5.2(C)), <br /> the Contractor must: <br /> A. Affirmatively represent and warrant that it did not perform substitute work; <br /> B. Identify the specific resources that were idled; and <br /> C. Show that those resources did not, and could not, work on other contracts or projects ' <br /> during the delay. <br /> 12.4.3.5.2.2 No Material Variations <br /> To demonstrate the Contractor's Overhead costs did not materially vary from its usual seasonal Overhead <br /> costs during the period of delay (section 12.4.3.5.2 (D)), the Contractor must; <br /> A. Affirmatively represent and warrant that the completion of the subject work was extended <br /> and that such extension prevented the performance of other work during both the period <br /> of delay and the later period of time required to complete the extended work, <br /> B. Disclose the details of Contractor generated billings and Contractor Overhead Costs (as <br /> hereinafter defined)throughout the actual project performance. The details of such <br /> information should be no less than specific identification of the sources and amounts of <br /> revenue on no greater than a monthly basis and specific identification of the types and <br /> amounts of Contractor Overhead Costs on no greater than a monthly basis for the actual <br /> project duration. <br /> 12.4.3.5.23 Overabsorbed Overhead <br /> To demonstrate that it did not incur Overabsorbed Overhead in the period following the delay (section <br /> 12.4.3.5.2(E)), the Contractor must: <br /> A. Affirmatively represent and warrant that completion of the delayed work prevented the 1 <br /> performance of other work; <br /> B. Identify the critical resource unavailable for other work due to completion of the delayed <br /> Contract; and ' <br /> C. Showing that unavailability of this critical resource precluded the performance of other <br /> work. <br /> EVERETT RIVERFRONT SURCHARGE GENERAL CONDITIONS <br /> PHASE 3 <br /> 00710-46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.