My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB CONSTRUCTION INC. 6/23/2010
>
Contracts
>
Capital Contract
>
KLB CONSTRUCTION INC. 6/23/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:20:17 PM
Creation date
2/7/2019 12:15:48 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB CONSTRUCTION INC.
Approval Date
6/23/2010
Council Approval Date
6/2/2010
Department
Public Works
Department Project Manager
TIM MARKS
Subject / Project Title
Riverfront Surcharge Phase 3
Public Works WO Number
RD3316-32
Tracking Number
0001630
Total Compensation
$2,967,195.01
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State of Washington <br /> DEPARTMENT OF LABOR AND INDUSTRIES <br /> Prevailing Wage Section-Telephone(360)902-5335 <br /> I <br /> PO Box 44540,Olympia,WA 98504-4540 <br /> Washington State Prevailing Wage Rates For Public Works Contracts <br /> I The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. <br /> On public works projects,workers'wage and benefit rates must add to not less than this total. A brief description <br /> of overtime calculation requirements is provided on the Benefit Code Key. <br /> I SNOHOMISH COUNTY <br /> EFFECTIVE 3-03-2010 <br /> ********************************************************************************************************** <br /> I <br /> (See Benefit Code Key) <br /> Over <br /> PREVAILING Time Holiday Note <br /> I <br /> Classification WAGE Code Code Code <br /> ASBESTOS ABATEMENT WORKERS <br /> JOURNEY LEVEL $40.03 1H 5D <br /> ' BOILERMAKERS <br /> JOURNEY LEVEL $56.53 1C 5N <br /> BRICK MASON <br /> BRICK AND BLOCK FINISHER $39.49 1M 5A <br /> I JOURNEY LEVEL $46.35 1M 5A <br /> BUILDING SERVICE EMPLOYEES <br /> JANITOR $8.73 1 <br /> I SHAMPOOER $9.23 1 <br /> WAXER $9.23 1 <br /> WINDOW CLEANER $13.48 1 <br /> CABINET MAKERS(IN SHOP) <br /> I JOURNEY LEVEL $25.69 2M 5C <br /> CARPENTERS <br /> ACOUSTICAL WORKER $48.60 1H 5D <br /> I BRIDGE,DOCK AND WARF CARPENTERS $48.47 1H 5D <br /> CARPENTER $48.47 1H 5D <br /> CREOSOTED MATERIAL $48.57 1H 5D <br /> DRYWALL APPLICATOR $48.74 1H 5D <br /> I FLOOR FINISHER $48.60 1H 5D <br /> FLOOR LAYER $48.60 1H 5D <br /> FLOOR SANDER $48.60 1H 5D <br /> I MILLWRIGHT AND MACHINE ERECTORS $49.47 1H 5D <br /> PILEDRIVERS,DRIVING,PULLING,PLACING COLLARS AND WELDING $48.67 1H 5D <br /> SAWFILER $48.60 1H 5D <br /> SHINGLER $48.60 1H 5D <br /> I <br /> STATIONARY POWER SAW OPERATOR $48.60 1H 5D <br /> STATIONARY WOODWORKING TOOLS $48.60 1H 5D <br /> CEMENT MASONS <br /> I <br /> JOURNEY LEVEL <br /> DIVERS $49.15 1M 5D <br /> 8 TENDERS <br /> DIVER $100.28 1M 5D 8A <br /> DIVER ON STANDBY $56.68 1M 5D <br /> I <br /> DIVER TENDER $52.23 1M 5D <br /> SURFACE RCV 8 ROV OPERATOR $52.23 1M 5D <br /> SURFACE RCV&ROV OPERATOR TENDER $48.85 1B 5A <br /> I <br /> DREDGE WORKERS <br /> ASSISTANT ENGINEER $49.57 1T 5D 8L <br /> ASSISTANT MATE(DECKHAND) $49.06 1T 5D 8L <br /> BOATMEN $49.57 1T 513 8L <br /> I <br /> ENGINEER WELDER $49.62 1T 5D 8L <br /> Page 1 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.