Laserfiche WebLink
I . <br /> 1 SECTION 00350 <br /> SUBCONTRACTORS <br /> 1. List the names of the subcontractors with whom the bidder will subcontract if awarded the <br /> contract. Bidder may name itself any or all of the work,including one or more categories of work. <br /> I 2. For heating, ventilation, air conditioning, plumbing (as defined by RCW Chap. 18.106) and <br /> electrical work (as defined by RCW Chap. 19.28), Bidder MUST either identify itself or <br /> subcontractors. If Bidder believes such work is not part of the scope of work, Bidder shall <br /> write"NO WORK". <br /> I 3. For all other types and scope of work, the City will assume the bidder will perform with its own <br /> forces any and all types and scope of work for which a subcontractor is not identified. <br /> 4. Bidder shall not list more than one subcontractor for each category of work identified, unless <br /> I <br /> subcontractors vary with bid alternates, in which case the bidder must indicate which <br /> subcontractor will be used for which alternate. <br /> 5. Bidder's bid shall be deemed non-responsive and void if: <br /> IA. (For heating, ventilation, air conditioning, plumbing and electrical work) Bidder fails: (1) <br /> to submit as part of the bid the names of such subcontractors; (2)to name itself to perform <br /> such work; or(3)to write"No Work";or <br /> IB. Bidder names two or more subcontractors to perform the same work. m <br /> 6. The requirement to name the bidder's proposed heating, ventilation and air conditioning, ce <br /> plumbing, and electrical subcontractors applies only to proposed heating, ventilation and air <br /> I conditioning, plumbing, and electrical subcontractors who will contract directly with the general <br /> contractor submitting the bid to the City. 5. <br /> 1 Type/Scope of Work Name and Address of Subcontractor/Or Bidder <br /> E <br /> HEATING14O �� 8 <br /> Subcontractor,bidder or"no work"MUST be stated <br /> I VENTILATION AND AIR CONDITIONINGo iu vy�, <br /> Subcontractor,bidder or"no work"MUST be stated <br /> .11 <br /> PLUMBING(as described in RCW Chap. 18.106) 0 I) wtyte--- . <br /> Subcontractor,bidder or"no work"MUST be stated <br /> ELECTRICAL(as described in RCW Chap. 19.28) <br /> Subcontractor,bidder or"no work'MUST be stated Pro f ecS l on -1- e-, e-- ' m <br /> E <br /> m <br /> m <br /> m <br /> c <br /> 0 <br /> F--. <br /> c <br /> 111 <br /> o <br /> m <br /> co <br /> m <br /> c <br /> c <br /> LL <br /> U <br /> i "§Q7 <br /> C <br /> O <br /> o m <br /> . C <br /> Cn L <br /> I <br /> O ItiII <br /> O <br /> O E <br /> CV <br /> O_ <br /> r.,035 00350 I tn2 <br /> M 10 <br /> M m <br /> C1> <br /> Iad <br />