My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB CONSTRUCTION INC. 6/23/2010
>
Contracts
>
Capital Contract
>
KLB CONSTRUCTION INC. 6/23/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:20:17 PM
Creation date
2/7/2019 12:15:48 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB CONSTRUCTION INC.
Approval Date
6/23/2010
Council Approval Date
6/2/2010
Department
Public Works
Department Project Manager
TIM MARKS
Subject / Project Title
Riverfront Surcharge Phase 3
Public Works WO Number
RD3316-32
Tracking Number
0001630
Total Compensation
$2,967,195.01
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Contract Claim even if the Owner's Representative, inspectors or assistants purport to change the <br /> Contract. <br /> 10. Assistants and inspectors may advise the Contractor of any faulty work or materials or <br /> infringements of the terms of the Contract; however, failure of the Owner's Representative or the <br /> assistants or inspectors to advise the Contractor does not constitute acceptance or approval. <br /> 11. The Contractor shall submit supplemental working or detail drawings as required for the <br /> performance of the work pursuant to Section 2.4. Submittals. Except as noted, all drawings and other <br /> Submittals shall be delivered directly to the Owner's Representative. The drawings shall be on sheets <br /> measuring 22 by 34 inches, 11 by 17 inches, on sheets with dimensions in multiples of 8 1 /2 by 11 <br /> ' inches, or other size approved by the City consistent with the work to be detailed. Contractor shall provide <br /> drawings far enough in advance of ordering or installation to allow for review by the Engineer or other <br /> agencies and possible resubmittal and further review after resubmittal. Contract. After a plan or drawing <br /> has been reviewed and returned to the Contractor, all changes proposed by the Contractor shall be <br /> submitted to the Owner's Representative for review and comment by the Engineer. <br /> 12. The Contractor shall obtain the Owner's Representative's written acknowledgement of approved <br /> Submittals before proceeding with the work represented by the Submittal. Such review does not impose <br /> any responsibility upon the Owner, nor does it relieve the Contractor of any responsibility for the accuracy <br /> of the Submittal or its conformity with the Contract. The Contractor shall bear all risk and all costs of any <br /> work delays caused by resubmittal or correction of Submittals. The Contractor shall allow sufficient time <br /> for Engineer's review of Submittals and possible corrections by the Contractor so as not to delay the <br /> work. <br /> 13. The Contractor's bid price shall include all costs of all Submittals, including, but not limited to, <br /> working, detail and shop drawings. <br /> 14. See Paragraph 18.11 for status of Engineer during construction <br /> I4. CONTRACTOR <br /> 4.1. CONTRACTOR'S REPRESENTATIVE <br /> The Contractor shall notify the Owner in writing of the name of the person who will act as the Contractor's <br /> representative and shall have the authority to act in matter relating to this Contract. This person shall <br /> have authority to carry out the provisions of the Contract and to supply materials, Equipment, tools and <br /> labor without delay for the performance of the work. <br /> Contractor shall employ and keep on site on a full time basis personnel experienced in the management <br /> of construction of Projects of this size and type. These shall include, but not be limited to, a Project <br /> Manager and Superintendent. Neither the Contractor's Project Manager nor the Superintendent shall <br /> have supervisory responsibility for any other Project for the Contractor while assigned to this Project. <br /> Contractor shall employ and assign such additional, full time office, support and engineering personnel to <br /> support the Project Manager and Superintendent and allow timely completion of the Project. The Project <br /> Manager and Superintendent must be approved by the City, and such approval shall not be unreasonably <br /> withheld. Contractor shall submit personnel qualifications within ten (10)days of Contractor's execution <br /> of the Contract. Bases for disapproval include, but are not limited to, lack of sufficient experience <br /> managing the construction of similar type or size Projects or relationships on other Projects unsatisfactory <br /> to the City. City may require removal and replacement of Contractor's supervisory staff who are <br /> disruptive or who appear to lack sufficient competence to complete the Project successfully. <br /> 4.2. CONSTRUCTION PROCEDURES <br /> The Contractor shall supervise and direct the work and determine the means, methods, techniques, <br /> sequences and procedures of construction, except in those instances where the Owner, to define the <br /> quality of an item of work, specifies in the Contract, a means, method, technique, sequence or procedure <br /> for construction of that item of work. <br /> EVERETT RIVERFRONT SURCHARGE GENERAL CONDITIONS <br /> PHASE 3 <br /> 00710-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.