<br /> I reasons as noise, traffic, or other interferenc, with the neighborhood in which the Project is located, or
<br /> the lack of availability of inspectors during overtime or shift work.
<br /> I
<br /> 7.6 LABOR RELATIONS
<br /> The Contractor shall take all reasonable steps to prevent any labor Disputes involving the Contractor and
<br /> any of its subcontractors or suppliers of any products or services from disrupting the work under this
<br /> I
<br /> Contract or interfering with access to the Owner's property by the Owner, including its agents,
<br /> representatives, employees and officials, any other contractors engaged in construction activities, or
<br /> members of the public. In the event any picketing or other concerted activity by employees involved in a
<br /> I labor Dispute with the Contractor or its subcontractors or suppliers interferes in any way with access to
<br /> the Owner's property by any persons, the Contractor shall promptly and expeditiously take all reasonable
<br /> actions to eliminate or minimize such interference, including but not limited to: (1) utilizing all reasonable
<br /> means of restricting any picketing to a single entrance to the Owner's property; (2) posting Notices or
<br /> I
<br /> signs which advise interested persons and labor organizations that a particular entrance to the Owner's
<br /> property is for the employees of"primary"or, as the case may be, "neutral"employers; (3) policing
<br /> entrances to ensure that only authorized personnel may use those entrances; (4) notifying all interested
<br /> labor organizations of the"primary"or"neutral"status of particular entrances; and (5) in the event any
<br /> such picketing or concerted activity is unlawful or has a secondary impact upon the employees of neutral
<br /> employers, promptly and expeditiously taking appropriate action to seek recourse through the appropriate
<br /> governmental agency or state or federal courts to limit the location of such picketing so as to reduce the
<br /> impact thereof upon neutral employers.
<br /> The Owner will cooperate with the Contractor to accomplish the foregoing actions and will render
<br /> assistance as may be in the best interests of the Owner. However, the Owner shall have the right to
<br /> I
<br /> direct the Contractor to modify any of the foregoing actions the Contractor has taken or plans to take or to
<br /> overrule such actions, to designate the entrances to be used as"primary"or"neutral"entrances, and to
<br /> take appropriate legal action in order to protect the Owner's property and interests. In any event, the
<br /> Contractor shall be liable for all delays and costs, including costs to the Owner, and actual damages
<br /> I
<br /> resulting from the relocation, rerouting, delays or actions required to maintain the uninterrupted progress
<br /> of the work. Failure by the Contractor to take the actions described above or to comply with the directives
<br /> of the Owner shall be considered a breach of this Contract and the Owner may terminate the Contract or
<br /> ' suspend the Contractor as provided in this Contract.
<br /> 8. MATERIAL, EQUIPMENT, WORKMANSHIP AND CONSTRUCTION
<br /> UTILITIES
<br /> 1 8.1. GENERAL
<br /> I Unless otherwise specifically stated in the Contract Documents, the Contractor shall provide and pay for
<br /> materials, labor, tools, Equipment, water, light, power, transportation, supervision, and temporary
<br /> construction of any nature, and other services and facilities of any nature, whatsoever necessary, to
<br /> execute, complete and deliver the work within the specified time. Contractor shall be liable for all power
<br /> I
<br /> and water costs until Substantial Completion, whether such power or water is provided by temporary or
<br /> permanent facilities. Owner shall not be liable for any costs or Delays arising out of or caused by the
<br /> availability or lack of availability of permanent power or utilities. Material and Equipment shall be new and
<br /> I of the specified quality. Equipment offered shall be new or current specified models. This requirement
<br /> does not apply to minor details, or to thoroughly demonstrated improvements in design or in materials of
<br /> construction. Construction work shall be executed in conformity with the standard practice of the trade.
<br /> I 8.2. PRODUCT DATA
<br /> When specified, the Contractor shall provide data required for inspecting, testing, operating, or
<br /> maintaining parts of the work. Unless otherwise specified, such data shall be provided at the time the
<br /> I
<br /> referenced material or Equipment is delivered to the job site. The data shall be as specified and shall
<br /> include, unless otherwise specified, such items as shop drawings, erection drawings, reinforcing steel