Laserfiche WebLink
o , EROSlON C�NTRC�L N�T'ES: <br /> STEE� POST T DISTURBEG AREA 2 1. THE IMPLEMENTATION OF THESE. TESC PLANS AND THE CONSTRUCTION, MAINTENANCE, 12. WHERE STRA�lU MULCH FOR TEMPORARY EROSION� CONTROL IS REQUIRED, IT SHALL BE <br /> � �� REPIACEMENT AND I:PG�ZADING OF THESE TESC FACILITIES IS THE RESPONSIBILIlY OF APPLIED AT A MINIMUM THICKNESS OF 2 INCHES. <br /> FILTER FABRIC ON 2"x4" 14 � ' <br /> GAGE WELDED WIRE FABRIC 3 TYP ^ Z THE CONTRACTOR U(��lL ALL CUNSTRUCTION IS APPROVED. <br /> z 1 �_ 13. THE CONTRACTOR SHALL DESIGNATE A PERSON TO BE TESC SUPERVISOR. THE TESC <br /> � � � 2. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CI._EARLY SUPERVISOR SHALL BE RtSPONSIBLE FOR MAINTENANCE AND REVIEW OF TESC <br /> NEWL.Y GRADED ON - - <br /> o� � � �\� _ z� � �\ \\ �\ \\ �\��� � FLAGGED IN THE FIEL7 PRIOR TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, MEASURES AND FOR COMPLIANCE WITH ALL PERMIT CONDITIONS RELATING TO T�SC. <br /> DISTURBED SITE o \\ ��\,\\/ � � /\/\/�\//\//\/�\/ � <br /> ,/ � � /�//�/� NO DISTURBANCE BEY`OND THE FLAGGED CLEARING LIMITS SHALL BE PERMITTED THE THE TESC SUPERVISOR MUST BE AVAILABLE FOR RAPID RESPONSE TO TESC Pf�ODLEMS. <br /> � 3 TYP. y\ , /,,/ \�r`� FLAGGiNG SHALL BE MAINTAWEC� BY THE CONTRACTOR F�R THE DURATION OF THE CONTRACTOR WILL PROVIDE THE PUBLIC WORKS INSPECTOR THE NAME AND PHONE <br /> .�I i i r a�� : �'.� �' ,// 2, i // <br /> CONSTRUCTION. NUMBERS TO REACH THE TESC SUPERVISOR AT ALL TIM . <br /> N <br /> '- � � � �� �� <br /> r 3. THE TESC FACIUTlES SHOWN ON THIS PIAN SHALL BE CONSTRUCTED PRIOR TO ALL 14. SHOULD TESC MEASURES NQT BE PROPERLY INSTALLED AND MAINTAWED, THE P B <br /> CLEARING AND GRADlNG ACTIVIT�ES, AND IN SUCH A MANNER AS TO WSURE TH�T WORKS DEPARTMENT MAY STOP ALL WORK NOT PERTAINING TO THE CORRECTION OF <br /> g" � 3 INTERCEPTOR DITCH DETAIL SEDIMENT LADEN WATER DOES NOT ENTER THE DRAWAGE SYSTEM OR VIOLATE TESC PROBLEMS UNTIL TESC lS RETURNED TO THE PROPER OPERATION. <br /> BACKFILL AND -"' APPLICABLE WATER STANDARDS. � <br /> COMPACTED � C1 .3 NOT T� SCALE 15. ALL PERiMETER EROSION AND SEDIMENT CONTROL SHALL BE CONSTRUCTED, <br /> SECTION A-A 4. THE TESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR OPERATIONAL, AND INSPECTED BY THE PUBLIC WORKS fNSFECTOR PRIOR TO INITIATION <br /> NON-WOVEN SPUNBOUND WIRE RINGS (TYPICAL) ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE TES� OF CLEARING AND GRUBBING OPERATIONS. <br /> FILTER FABRIC - MIRAFI FACiLITlES SHALL BE UPGRADED (E.G., ADDITIONAL SUMPS, RELOCATIONS OF DITCHES <br /> 10C?X OR ENVIROFENCE 2"x4" 14 GAUGE WELDED AND SiLT FENCES, ET�C.) AS NEEDED FOR UNEXPECTED STORM EVENTS. 16. NATURAL VEGEfATION SHALL 8E ' MAINTAINED FOR EROSION AND SEDIMENT w;ON�TR�L <br /> A <br /> WIRE FABRIC �� �� WHERE POSSIBL . <br /> � 5. THE TESC FACILITIES SHALL BE INSPECTED DAILY BY THE CONTRACTOR AND MAINTAWED ��. A�L TEMPORARY EROSION AND SEDIMENT CQNTROL BMPS SHALL BE MAINTAINED IN A <br /> � AS NECESSARY TO ENSURE THEIR CONTINUED FUNCTIONING. <br /> SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS <br /> V U ` ' ) - ��� . . . � <br /> � � �� % 6. ANY AREA STRIPPED JF VEGET�TION, INCLUDING ROADWAY EMBANKMENTS, WHER� NO COMPLETED, PERMANENT DRAINAGE FACILlTIES ARE OPERATIONAL, AND THE POTENTIAL <br /> " r .-� � " zC �- �� FURTHER WORK 1S A��TICIPATED FOR A PERIOD OF 15 DAYS, SHALL BE IMMED(ATELY FOR EROSION HAS PASSED. <br /> I I J I'�J I'�I � I G .' . <br /> � , r � r STABILIZED WITH THE APPROVED TESC METHODS (E.G., SEEDING, MULCHING, NE�71NG, 18. AT A MINIMUM, EROSION AND SEDIMENT CONTROL FACILITIES SHALL �E :MAINTAINED <br /> I�I � I�I ---; � I�I �' , EROSION BLANKETS, ETC.) MONTHLY, OR FOL�OWING F�CH RUNOFF PRODUCING STORM, TO ENSURE PROPER <br /> V V � OPERATION OF ALL EROSION AND SEDIMENT CONTROL FACILITIES. <br /> II I I II ��N 7. ANY ARFA NEEDING TESC MEASURE, NOT REQUIRING iMMEDIATE ATTENTION, SHAL� BE <br /> a,, ��,�,.. ... .•. ;���� �� ,. �� •���,���,� �� - RING AND ADDRESSED WITHIN FIFTEEN (15) DAYS. <br /> SOLID LID, 19. APPROVAL OF THIS PLAN DOES NOT CONSTITUTE AN APPROV,AL OF DESIGN, SIZE, OR <br /> � (� 1 '�"' ( � I - COVER SET 1 ABOVE LOCATION OF PERMANENT PIPES, RESTRICTORS, OR DETENTION FACIUTIES; BUT IS AN <br /> I I `° S U R R O U N D I N G G R A D E 8. THE TESC FACiLITiES ON WACTIVE S1TES SHALL BE MAINTAINED A MINIMUM OF ONCE A APPROVAL OF EROSION AND SEDIMENT CONTROL BMPS ONLY. <br /> II ( lI ( I N MONTH OR WITHIN THE 48 HOURS FOLL�WING A STORM E V E N T. <br /> ELBOW 9. AT NO TIME SHALL M�RE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUcvIULATE 20. THE PUBLIC RIGHT-OF-WAY SHALL BE KEPT CLEAN. TRACKING 4F MUD AND DEBRIS <br /> ( I I I ( I II FROM THE SITE WILL NOT BE ALLOWED_ FAILURE TO COMPLY WITH THIS CONDITION <br /> A WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE WILL RESULT IN ALL WORK ON THE SITE BEWG STOPPED. <br /> STEEL POSTS BURY BOTfOM OF FABRIC ACCESS 12"s� PVC CLEANED PRIOR TO PAVING. TNE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT <br /> 6'-0" O.C. ELEVATION MATERIAL IN 8"X12" TRENCH �qDDER C� 1� MIN LADEN WATER INTO THE DOWNSTREAM SYSTEM. � <br /> 21. THE WASHINGTON STATE CLEAN A1R ACT REQUIRES THE USE OF ALL KNOWN, <br /> 10. STABILIZED CONSTRUCTIQN ENT@ANCES AND WASH PADS SHALL BE INSTALLED AT THE AVAILABLE, AND REASONABLE MEANS OF CONTROLLlNG AIR POLLUTION, INCLUQING DUST. <br /> NCE F CONST�UCTI0�1 AND MAINTAINED FOR THE DURATION OF THE PROJECT. DUST CAN BE CONTROLLED BY WETTING EXPOSED SOILS, WASH}NG TRUCK WHEELS <br /> 1 FILTER FABRIC FE BEGINNING 0 <br /> z I ( --'" ADDITIONAL MEASURES I�iAY BE REQUIRED TO INSURE THAT ALL PAVED AREAS ARE BEFORE THEY LEAVE THE SITE, AND iNSTALLING AND MAINTAINING ROCK CONSTRUCTION <br /> C1 .3 NOT TO SCALE ENTRANCES. CONSTRUCTION VEHICLE TRACK-OUT IS A MAJOR SOURCE OF DUS7 AND <br /> � KEPT CLEAN FOR TH� DJRATIC�°� OF THE PROJECT. (RCW 46.61 .655). DURING THE ANY EVIDENCE OF TRACK-OUT CAN TRIGGER FINES FROM THE DEPARTMENT OF <br /> - TIME PERIOD OF OC1��BER 1 THROUGH MARCH 31 , ALL PROJECT DISTURBED AF?��,S ECOLOGY OR THE PUGET SOUND AIR POLLUTION CONTROL AGENCY. <br /> `- Z GREATER THAN 5,000 SQUARE i=EET THAT ARE TO BE LEFT UNWORKED FOR MORE <br /> � THAN 12 HOURS SHR:LL BE COVERED BY ONE OF THE FOLLOWING COVER MEASURES: 22, EVERY EFFORT SHALL BE MADE TO CLOSE UTILITY LINES BY THE END OF THE DAY <br /> a D O��o MULCH, SODDING, BOUDED FIBER MATRIX, OR PLASTIC COVERING. THE COVER AND MATERIAL EXCAVATED DURING UNDERGROUND UTILITY CONSTRUCTION SHALL 8E <br /> G� MATERIAL NECESSARY TO C�VE!� ALL DISTURBED AREAS INSIDE THE CLEARING l.'"�11TS p�qCED ON THE UPHILL SIDE OF TRENCHES (WHERE CONSISTENT WITH SAFETY AND <br /> � �� - EXIST GRATE � M <br /> SHALL BE ON-SITE BETWEEN OCTOBER 1 AND MARCH 31 . SPACE CONSIDERATIONS). <br /> LIFTING RODS <br /> (1 EA SIDE) 12"tb PVC z 11 . WHERE SEEDING FOR TEMPORARY EROSION CONTROL IS REQUIRED, FAST GERMII�ATING <br /> � 2% MIN � GRASSES SHALL BE F�PPLIED AT AN APPROPRIATE RATE (E.G., ANNUAL OR PERE��INIAL <br /> � RYE APPLIED AT APPFZOXIMATELY 80 POUNDS PER ACRE). <br /> \:.;:;;..:.::�::::��::.:;;;::�:;�:::::::��;����::::;:::: 4$�►� . <br /> . . ... .. <br /> ...... ... .. <br /> ............ .............. MANHO _ <br /> . ......... ..... r__ x .. .�_ __rr _, �. <br /> FILTER BAG , . ���� �;;��� .���'F�''���'���� --., . � <br /> \��i\�i\�i\�i\�i; ,�i.��i.��i.�l u_ _� .Y.,� �` � <br /> SECTION £c � � <br /> r� o'' �CT � � ���� �� � <br /> � <br /> ��.�.; :r <br /> ,�'���i,a-2/%L-�- ��.�` , <br /> 5 G R IT C HAM B E R � -�����; �L��e��� ��T� ��s�a� ,A�����r; <br /> ������;�o�r�;�": <br /> C1 .3 NOT TO SCALE (CONTRACTOR'S OPTION) � �� � �Ye z!E� �����:�GE ' <br /> ;a <br /> r1SC���O � O�Q°O�°O Q A P�IG tf`1QRkCS PERPflIT!S �EQUIRED PRIC4a; <br /> EXIST GRATE o °°�°��O°°80° �°°�°0�°080�o PP__---L ' _ To u�s�,�-ri�c� A�v co�sYauc��sc��� ��y ��a�, ' <br /> po 0�o���o��o�lJ�o� �� o��o���o� �o � �d�� �i�4�'9i�i�S�c� '��}�f?,D��Y. ��P43�VAt, POF� T4�85 P�QJE�? e:�� <br /> SLOPE DOWN TO o��o�°o�oo$ o 0 0 oo Q o ���r����c��,a�. ���a eu�a��+� s����s�u����s` <br /> o�b°o80°80�° � �0�0�0�0 � ��°�Cj�°�� <br /> EXIST SPI�LWAY �F��� ���;��-��..2Q1J������ ���rr�r <br /> � o �°080 080 0 °080°oBo�oSo°�°°� o �°°�°°80°o PP-� �-�� � ��,G-r�fi«����, ��e ����; ��s�_l, _ <br /> • \ , o �� o oog .aog o oog a oog o 0 oog o _ .�-��� � <br /> � � � � .. \ � •\ � �\ � ,� T SPILLWAY °�°S°°� O°°�°°go°°��°g0°°��°oO°o8o°a � � o o RAP 2% SLOPE TO DRAIN J <br /> .r\ r\ �\ �\ /� �'�::::��:�:::�:::�:::�:��:�::�:::�::�:;�::;�•::� E X I S o o O o 0 0 0 0 0 <br /> �.:��:::��:::.�: ...::::::.�...:.. o o p o o� og a o o EXIST RIP <br /> � . . . . .. .... °� O °� °O °�b �� °� o8�b O °� I LL Y <br /> ............... ............... / ► o °o 0 0 0 0 0 0 0 °o o °a °o o TO EXI SP WA <br /> a �' � � 080 °� o o � °�o �� o 0 0 °� o °� o °� S P i LLWAY ST <br /> � i � ' t - � r � � �� � � o 0 0 0 0 0 0 0 °o °o °o °o <br /> � � ; � ' � ' oa o� o �O o� °�o�"J o�0°80 00�0808 0� ao �O o�0 a <br /> � ' , ,j ' ` �o0 00 00�o°�b,,�o�� m 0o0�°�b�,.o�,008°�08 000�000,,�0°��,,��o0 o°g0,,�0°�� <br /> \ � . i ''� � "' � oaQo o�o o p aoCo 00 oYoO, � �Jo 000a o000 oo1..Jo 00 0 0�o 000°o o° _�y-� ��-, (}�-� 08 (p,-, 08 °o °o �/��/.V <br /> O � O � q f � � � Q� � � � o o�$ o( p 0( p 0 0_Q 0 0_p 0 0 0 000 0� op�///// <br /> � a � /` i i s` i � � �� �Q °� �°p--O°p ° �Q' ��p oQ o 0 0 0 o A �-?. � o� op� o-oV�o-OV o� ooV op0 o_oV o o�� o \� <br /> ........ ........ <br /> � o 0 0 0 0 0 �� �'oo °�b o 0 0 0 0 ��, °So °� oo °� °go °� � o 0 • °80 °� o �� <br /> i c <br /> " �r� ` � � ���v� ���� / o 0 0 0 0 0 0 0 �, �'o 0 0 0 0 0 0 0 0 0 / //� <br /> ; d FILTER BAG � � ; o 080 0�0 080 08�°� c �//�.30 °� °80 80 °80 � °80 °� � , °� °80 °� °80 °� °� <br /> :a � , � � 1 � , � a � , , , oo ao 00 00 °o g°o�r�,o�o0 0 00�o0 00�o0 00 00 = � , a o 0 0 0 0 0 0 � /,�� <br /> a �� , - , , , o�O �oo 0o g°�o o°�o o�oo oo� o� oa o°oo 000 0°00 000 000 0� o r ; �, ,�o 0 000 00 �\�,./ <br /> 0 <br /> � _ , ; oo �o �o F �°oo°�°�°�°�° � <br /> � a /� EXIST CB ',� � � ;- � � �, � � ; �000 00 ��°80�00���,��ao8�o�°�og�$o�°� o o°� o°� � ' _ _ , , ,, , ,� G "� pD : p ,/����,r,� � GEOTEXTILE <br /> a \ ' � o 0 0 0 0 0 � oog^� 08 �08 �V��� 8 �08 <br /> i � ` o oQo�°� o °� °� ^90 0 0 0 0 o �(�a o � ., . .,, �i . �, ,i.:. , � �. <br /> � \ . e .r ,,.�; ��' � �:; . .. �:' , ,. .;,- . :.,-; o 0 0 0 0 o O 11 o O O O�O V O�O O Iti D . �� . <br /> ` " , .., <br /> .d. O OO O Oo8 O O a�� o� o -0 0� � �� . <br /> / - / � o � � �� . <br /> � �� \�� °o o °°o °o °°o °o °o 00 op0 000 00 o O oo AA �-- N z ° / <br /> \ .� a : �\ �\ c.� o°o �$o °800°So °�oo°�b°80 °80 0 " � e � 1 ' R i P RAP <br /> � � °�o�Go S�o 0 00 80�0��0��0 800 0�°000 0 o�o o go o 2 4 � GRATE � , . <br /> o�o�o o ��o�o�oo�oo 0 0 0�0�o p � '- DEPTH, M W <br /> � � <br /> _--�- o�oogC��oo o ao80oo8 � o o°o °°So°°8 � /�` � <br /> --- °°��g°��oog��o8o oSo o�BooS 8oc�°o� °08 Tl'PE 3 54"� ; PP <br /> � � <br /> � �o �Q o�o o�o a�o �o �o �o ° CATC H BASI N <br /> �° \.\� � \�; ��go°°�o� °go���g�°� � P D o <br /> � � I /� D , <br /> I \\/\ o 0 0 o A�p o <br /> � � � � ° ° �a o o �\� PLAN � . SECTION A-A _ , <br /> � � . ' � /\� Q a . \\\ <br /> � <br /> � � � ,.P � �/i�/i�/i�/i�/i�/i�/i�/i, <br /> °' ` � SECTION 4 ENERGY DI��APATOR DETA1L5 <br /> �� <br /> � C1 .3 NOT TO SCALE <br /> � 2 CATCH BASIN SEDIMENTATION C�NTROL <br /> � <br /> � NOT TO SCALE <br /> o C1 .3 <br /> N <br /> / <br /> � <br /> �y � PROJECT ENGINEER: SCALE: DWG. NO. <br /> � �' � � T C� F �V � � � `TT <br /> � � � ��+o wK�YA H. KUYPER 1 "=50' � 1 . '� <br /> a I I I I r� p��` ��/�c.'��� DESIGNED BY: DATE: <br /> � ;��; � _ o�. NORTH MARINA RED�VELOPMENT <br /> N �r O �}; D. YE AUGUST 4, 20�� ciP No. <br /> `tr INFRASTRUCTURE PHASE 1 <br /> 3--0-003-09 <br /> � 72$ 134th Street SW ' Su�le ZQO 'A � Q DRAWN BY: CHECKED BY: <br /> 0 90,� F�S6 E R``� `�`` G. M E N D E N H A L L H. K U Y P E R PROJECT <br /> � Fss, ��o•� . . T E M P O R A R Y E R O S 1 0 1�I N o. P D--N M-2 0�5-0 6 <br /> � E v e r e t t. W a s h i n t o n 9 8 2 0 4 o N a� <br /> o P.O. BOX 538 g O Q 8 f 4/06 PERMIT APPROVAL/CONSTRUCTION � '� '° P P R O V E D B Y: , <br /> - EXPIRES 3 07 l.� C� N T R 0 L N �T E S �c D E T A I L S SHEET ;VO. o F <br /> EVERETT, wa sszas Ph: 425 741 3800 03/0 / 19 ��3 <br /> � (425) 259-3164 N0. DATE BY R�lISiON N0. DATE BY REVISlON <br /> a JOB No. 21-04-015 <br /> . <br />