Laserfiche WebLink
July 12, 2017 <br /> 150-ft Monopole Tower Structural Analysis Report CCI BU No 826263 <br /> TEP Project Number 46302.124891,Application 394797,Revision 1 Page 2 <br /> TABLE OF CONTENTS <br /> 1)INTRODUCTION <br /> 2)ANALYSIS CRITERIA <br /> Table 1 -Proposed Antenna and Cable Information <br /> Table 2-Existing and Reserved Antenna and Cable Information <br /> Table 3-Design Antenna and Cable Information <br /> 3)ANALYSIS PROCEDURE <br /> Table 4- Documents Provided <br /> 3.1)Analysis Method <br /> 3.2)Assumptions <br /> 4)ANALYSIS RESULTS <br /> Table 5-Section Capacity(Summary) <br /> Table 6-Tower Component Stresses vs. Capacity <br /> 4.1) Recommendations <br /> 5)APPENDIX A <br /> tnxTower Output <br /> 6)APPENDIX B <br /> Base Level Drawing <br /> 7)APPENDIX C <br /> Additional Calculations <br /> tnxTower Report-version 7.0.5.1 <br />