My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
301 W MUKILTEO BLVD 76 STATION 2019-02-12
>
Address Records
>
W MUKILTEO BLVD
>
301
>
76 STATION
>
301 W MUKILTEO BLVD 76 STATION 2019-02-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2019 11:33:59 AM
Creation date
2/12/2019 11:33:58 AM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
301
Tenant Name
76 STATION
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REG 07-10--20ioo(7IJE) 13:01 <br /> REG-1 <br /> 019235 <br /> PERMIT No. <br /> 18(jr,Li10 CT 1 <br /> /A,‘//411140.74ETT TL 1. <br /> (425)257-8810 CAF90.51 <br /> Plan Check No.: S1806-010 <br /> Application Date: 6/28/2018 <br /> Tenant: 76 SITE#881893 <br /> Owner: HWAN YOUNG LLC <br /> Job Address: 301 W MUKILTEO BLVD <br /> Proposed Use: <br /> Description of Work: REFACE POLE SIGN CABINETS/INSTALL <br /> (2) LED ILLUMINATED LOGO <br /> Plan Check Fee Paid: $90.51 <br /> The building permit application for the above-referenced project is being conditionally accepted for filing <br /> pending the determination of its completeness. <br /> If the City review determines that any additional land use approval or any additional information is <br /> required to complete your building permit application,it will be necessary to submit this additional <br /> information or acquire the additional land use approval prior to your application being considered complete <br /> for filing.If no other land use approval or additional information is required,your building permit <br /> application will be considered filed as of this date. Plan review fees are estimates. Final plan review fees <br /> will be calculated at permit issuance. <br /> BUILDING PERMIT APPLICATIONS EXPIRE IF NO PERMIT IS ISSUED <br /> WITHIN 180 DAYS FOLLOWING THE DATE OF APPLICATION. <br /> Signature Date <br /> FILE COPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.