Laserfiche WebLink
INSPECTION REPORT <br /> ,N ,/,,,;,...rmr-,,,, <br /> � Date /2_7JS Permit: 73e05—0433___.__ <br /> Contractor: <br /> \-1 Owner: Chaff <br /> Site Address: 1z7=A = Mu _INA <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ['Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailin. ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains -i i., •• 1❑Refrigeration ❑Rough in <br /> ❑Roof drains 4 :uilding Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: 1 205-200 O-iii-10 <br /> P— FrnZTVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> p2, Naw ( -- <br /> /U7Z�NI f S' 1/is0/ <br /> lz--,z/xo,10. <br /> 0,6 r 7--e, OA- #f' /vim '141e- <br /> \ <br /> r.,...--. <br /> /0 <br /> Inspector: <br /> p Date: —/ <br /> EIR(10/06) ATANC. <br />