Laserfiche WebLink
Work Activity Work Order Page 2 <br /> 2/6/2019 11:15 <br /> Issued By EAL ERICKSON,ANDREW L. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 1/2/2019 <br /> Fund 401 Account 5 Program Function Activity <br /> Program UT3473 16 3 <br /> Title CONVERT.75 INCH 3410 W MUKILTEO BLVD UT3473-16-3 <br /> Work Order No 20190017 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 1/2/2019 Time 08:16. Original WO Billing <br /> Problem Details <br /> CONVERT.75 INCH CURBSTOP TO.75 INCH SETTER WITH METER AND <br /> BOX. FLAT TO METER PROGRAM. <br /> Structure ID StrTyp Activity Compl Date Comments <br /> WS3494T012 WASRVC YES 1/2/2019 <br /> Address 3410 . W MUKILTEO BLVD <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference 3410 MUKILTEO BLVD <br /> Location <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M BOX000154347 BOX METER MOLDED PLASTIC W/DI LID 11"X 18" (SMALL) 1 74.232 01/04/2019 PM <br /> M COUP34142747 COUPLING 3/4 CTS COMPRESSION X 3/4 MIP.871-.879 1 11.78 01/04/2019 PM <br /> M ELLO34154947 ELBOW 3/4 NPT 45 DEG STREET BRASS(1/8 BEND) 1 4.2 01/04/2019 PM <br /> M METE34141847 METER 5/8 X 3/4 NEPTUNE W/E-CODER R9001 CU FT STUB ANTENNA 1 196.418 01/04/2019 PAD <br /> M NIPP34131247 NIPPLE 3/4 NPT X CLOSE BRASS 1 1.406 01/04/2019 PM <br /> M SETT34'146547 SETTER COPPER 5/8 X 3/4 HEIGHT 9"NO LEG LENGTH HI/HO 1 111.733 01/04/2019 PM <br /> Total Material Cost $399.77) <br />