Laserfiche WebLink
INSPECTION REPORT <br /> Date t / '-z( Permit: G 7// - ©©I <br /> Contractor: Q 4-5 Biel" coo...4 t-etGt/ <br /> Owner: . / -'- Corip k1 !—Ort,..di,� <br /> n <br /> Site Address:--a-- -- 1II it—ke , <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL _ BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL F AL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION R Q ESTED EllI A OK FOR C.O. ❑ VIOLATION /'1 <br /> ja, NABLETO PERFORM INSPECTION: V <br /> j CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> / <br /> i <br /> Inspector: i r Dater / �/� /� <br /> EIR(10/06) DATABAR,INC. <br />