Laserfiche WebLink
Work Activity Work Order Page 2 <br /> 1/11/2019 8:22 <br /> Issued By HLJ HUSBY,LANCE J. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 12/15/2018 <br /> Fund 401 Account 5 Program Function Activity <br /> Program UT3473 16 3 <br /> Title CONVERT.75 INCH 5032 33RD AVE W UT3473-16-3 <br /> Work Order No 20182803 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 12/15/2018 Time 06:35 Original WO Billing <br /> Problem Details <br /> CONVERT.75 INCH CURBSTOP TO.75 INCH SETTER WITH METER AND <br /> BOX. FLAT TO METER PROGRAM. <br /> Structure ID StrTvp Activity Compl Date Comments <br /> WASRVC YES 12/15/2018 <br /> Address <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference <br /> Location <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M ADAP34000447 ADAPTER 3/4 IPS INSTA-TITE UNION 1 21.175 01/02/2019 PM <br /> M ADAP34000547 ADAPTER 3/4 MIP X 3/4 IPS INSTA-TITE 1 15.277 01/02/2019 PM <br /> M BOX000154347 BOX METER MOLDED PLASTIC W/DI LID 11"X 18" (SMALL) 1 74.232 01/02/2019 PAP <br /> M METE34141847 METER 5/8 X 3/4 NEPTUNE W/E-CODER R9001 CU FT STUB ANTENNA 1 196.418 01/02/2019 PM <br /> M NIPP34131247 NIPPLE 3/4 NPT X CLOSE BRASS 1 1.406 01/02/2019 PM <br /> M SETT34146547 SETTER COPPER 5/8 X 3/4 HEIGHT 9"NO LEG LENGTH HI/HO 1 111.733 01/02/2019 PM <br /> Total Material Cost $420.25 <br /> NA Costs <br /> Type Na No Description Quantity Cost Billing Date War <br /> NA N/A 3/4 MINUS ROCK .25 6.405 01/02/2019 <br /> NA N/A TOPSOIL .13 3.851 01/02/2019 <br /> Total NA Cost $10.26 <br /> Personnel Costs <br />