My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3703 RAILWAY AVE KIMBERLY CLARK 2018-01-01 MF Import
>
Address Records
>
RAILWAY AVE
>
3703
>
KIMBERLY CLARK
>
3703 RAILWAY AVE KIMBERLY CLARK 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2019 7:45:11 AM
Creation date
2/13/2019 7:41:51 AM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
3703
Tenant Name
KIMBERLY CLARK
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. I;ivcrsidc 1!�aste Wood Handlin�� <br />Revision No. 3 5-13-02 <br />RIVCI2SIDC WOOD WASTE HANDLING <br />INTRODUCTION <br />r,t� .; <br />Contractor shall providc consiruction services to canstruct a paved arca at the Rivcrside <br />site for tlm hmidling ancl processine of railroad tics into hogged fuel, and install three <br />additional firc hvdran�s and a sen icc wcrtcr h�drmri in ihc arca. <br />11. SCOI'E OF �1'ORK <br />Contractor shall perform all operations reyuircd for construction installation of this proj �, � <br />as ;cncrally outlincd in Sectiuns A�� 13 bclo��. l�hc \'1'ork is furthcr dctincd in thc <br />sp�ci(ications listed in Scetion VI and in thc referenccd dra�� ines listcd in Attnchmcnt I. <br />which ���ill bc incorporatcd hcrcin by refcrcncc. <br />All equipment and matcrials necessan� for the ��ork shall be pro� ided b� the Contractor. <br />l�hc Contractor undcrstvids that thc rcfcrence dra���ines and informntion hcrcin dcfincd is <br />somewhat ceneral in nature, and is not necessarily in its final fonn. The purpose of the <br />drawine is to illuslrate the intent of the ownec The drawing is not necessarily complc�c in <br />evcry Jetail and it is thc responsihility of thc contractor �o employ eood construction <br />practiccs in thc csccuiinn of thc �vork to achicvc thc intcnt. <br />� I�hc work sh,ill includc all iicros idcntificd in thc scopc of ��ork and all :utachments ta thc <br />project specification document. <br />SCOPL OI' N'ORI: <br />:\. Ci��il and Sitc ��'ork <br />NA I'/�\'G <br />l. <br />?. Gscav;uc thr sitr tu a minimum dcpth of 12 inchcs bclo�v thc nominal eradc of thc <br />adjaccnt �ard, ar tu a dcpth th:n �� ill cet do��•u to solid soil. It is assumed tliat 12.. <br />should bc adcquatc. <br />+. Furnish and inst:lll 3 l'�iCll I7851115, oil sepnrator and interconnecting pipine as <br />sho�� n on drawine Notc that onc of�tlu catch basins is locatcd north of the <br />railro�d track and tlu pipc from this onc must run undcr thc track. <br />d. Install and compact 1-1/2', minus base. Install base in appro�. S" lifls and <br />compact bctwcen IiRs. <br />�. Furnish and apply soil stcrilizcr. <br />G. Purnish and install G inch asphalt pa��ing. Pa��c �vith 4 inches of base course and ? <br />inchcs of class [3. Slope to catch basins. <br />7. Furnish and install Jerscy barricrs for perimctcr protcction as sho���n on drawinc <br />Pror�d< <,�r,,,,,,,i �r,�„��� nu n per-sqrrnrc ��nrd Gnsis jor nc� joUowing: <br />I. If solid soil is not rcached at I? inchcs of dcpth, c�cacatc unsuitablc matcrial <br />do�cn to solid soil or a depth of t�co feet, «hich ever eomes first. <br />r �. I�urnish anJ install gcotc�tilc (:�bric lor thosc areas whcre sulid soil is not rcaclud. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.