Laserfiche WebLink
� erly-Clark Corporation Jacobs Engineering <br />Project I;ngineering Team <br />Project: Riverside Waste Wood Handling <br />ADDENDLTM 3 TO PROJECT SPECIFICATION 5-3i-o2 <br />i. Refer to drawing C2��-L-u8. Look at the "llesign Notes" and notice the last <br />paragraph where it says "Additional barriers or ecalobry Ulocks may be needed to contain <br />unloading ramp embankment." This addendum is to verify that these ecology blocks <br />will be needed. They should be placed along the toe of the embankment on the south <br />side. The ne�v paven!ent will come right up to the Ulocks. Please include them in your <br />bid. <br />