Laserfiche WebLink
Venzon �lorth�:�iest has facilities near this IocaUon. rloivev2r, any bwldin� entrances rnust <br />be coordinated at least 60 days m advance. Ti�e cost o( any relocahon of Verizon facihtie; <br />ihat is required to conslruct the nevu apartments wii� he at the total expense of the <br />developer. Any relocalion will take 60 to 120 days. Please coniact Ni��<e Hupf, Enrinezr :; <br />(425) 356-4052 or Ntilce 61y, Engineer al (425) 356-4034 if you have any q��stions <br />regarding this building entrance. <br />4. Verizcn Norlhwest uvill provide seriice to tne site. However, new telephone caLle <br />construction ��vill be required in conjunction with th2 site development. Verizon's <br />engineering tvill begin when they are notified ef your construction schedules and talephone <br />requirements. <br />5. It v�ill be the developer's re:sponsibility to provide a suita6le combination of conduit and <br />trenching and/or riser conoeit to accommodate Verizon's nehvork communications cabie <br />vnthin the complex Provided that an acceptable combination of condu�t andler trenching is <br />incorporated into Ihe prc�ect to accommcdate Verizan's entrance caole, th-:re ivi'I oe no <br />cosis to ihe developer for Verizon's cable. <br />6. If a rearrangement of existing cables on premiszs or on tl,,e rigi,t-oi-���ay is necessar„ <br />appropriate charges �vill be estimated and Verizcn's Guaranty oi Payment �rom �vill be <br />fon,varded to you for your signature. Prior to commencement or Verizon's 2ngineering for <br />such rearrangement, a deposif will be required. To insure timely telephone service, <br />Verizon requests ninety (90) days lead time `or engineerirg, procurement, and instaliation <br />of cahle and/or Verizon's equipment. <br />Please contact iviichaet Hupf, Engineering, at (425) 356-4052 or Mike Bly, Engineer at <br />(4:'S) 356-�3034 snc;iid you rec,u�re add�tional information. <br />S:'J-5'�CA �,!^.'IW: JORp'$EPA'�1 t-019_ DVS_Plu! Ce o! Arp ccc <br />C I� �1 � � <br />\ <br />