My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1110 RAINIER AVE A DOMESTIC VIOLENCE SERVICES OF SNO CO 2018-01-01 MF Import
>
Address Records
>
RAINIER AVE
>
1110
>
DOMESTIC VIOLENCE SERVICES OF SNO CO
>
1110 RAINIER AVE A DOMESTIC VIOLENCE SERVICES OF SNO CO 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2019 10:32:45 AM
Creation date
2/13/2019 9:24:55 AM
Metadata
Fields
Template:
Address Document
Street Name
RAINIER AVE
Street Number
1110
Unit
A
Tenant Name
DOMESTIC VIOLENCE SERVICES OF SNO CO
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />� <br />FI�AI_ <br />MI7IGAT�D �E7�RMl�;ATiO:J OF NON-SIGNIFICr1�1C� <br />se�� a��i�ona <br />DUS She9?er, Administ�ative Oificas anu' Transitiona, Housiny <br />?:ecern6er 22, 2011 <br />;:� <br />;; �,�!i=�, <br />�,; :-1 <br />,��-J - - <br />„`..:,� _ ., � <br />Descrdptioi oi FroNosal: Domestic Violence Sheiler ior victims of domestic violence. Project <br />includes the following phases: <br />°hase I: Renovation of main existing building for administraiive offices and shelter, including <br />construction of twe (2) additions at lhe north of the shelter for additionai rooms and resident <br />suoport services. Phase 1 also includes renovation oF existing maintenance building for a <br />resident activity center and exterior play areas oetween the buildings. Some additional pa�nng <br />uvill be removed and some added for the revised parking layout. <br />Phase IL• Consiruction of a 20-unit tvvo-story apartment building including common space fcr <br />meetings, 3 offices, laundry room, maintenance sforage and restrooms. There w�ll also be a <br />28-space parking lot and some exterior pla/ areas. tiL'TE: The p:nposed project site is in the <br />BMU zone, and the shelter and transitional housing units are subject to compliance evith tl�e <br />BNIU Design Standards per Section 31A.040 of the Everett Municipal Code. The applicant can <br />request a modification or exemplion of these standards as governed by the procedures <br />established in TiUe 15 for Revievd Process II <br />A�p'�ICant <br />Represer�ative: <br />Location: <br />Zoninn: <br />General PEan: <br />Laad Agency: <br />DVS of Snohomish County <br />PO Box 7 <br />Everett, WA 982QG <br />Margaret Br�land, Director <br />1110 Rainier Avenue <br />BMU, Broadway Mixed Use <br />4.4, Mixed Use Commercial - Multiple Famil;� <br />City of Everett Planning Department <br />Contact Person: Faheem Siddiq <br />�litiaation Measures. <br />Phone. (4?5) ?57-71�92 <br />The environmental impacts of this proposal are documented in the Envirnnmenlal Checklist 2nd <br />other information on file with lhe City. The listed reyuirements are placed in response to our <br />revie�,v of (his informaliorc <br />AGENC3Ec NVI i �J JL'RISL`::.T::)M <br />� <br />/ J� <br />
The URL can be used to link to this page
Your browser does not support the video tag.