My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1110 RAINIER AVE A DOMESTIC VIOLENCE SERVICES OF SNO CO 2018-01-01 MF Import
>
Address Records
>
RAINIER AVE
>
1110
>
DOMESTIC VIOLENCE SERVICES OF SNO CO
>
1110 RAINIER AVE A DOMESTIC VIOLENCE SERVICES OF SNO CO 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2019 10:32:45 AM
Creation date
2/13/2019 9:24:55 AM
Metadata
Fields
Template:
Address Document
Street Name
RAINIER AVE
Street Number
1110
Unit
A
Tenant Name
DOMESTIC VIOLENCE SERVICES OF SNO CO
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />Evereft Housing Aufhoriry <br />N1ay 16, 2012 <br />ADDITIONAL SERVICES <br />� <br />JN ' 20f30 <br />Page 13 <br />In addition to reviewing the final plans, Geotech Consultants, Inc. should 6e retained to provide <br />geotechnical consultation, testing, and observation services during construction. This is to confirm <br />that subsurface conditions are consislent with lhose indicated by our exploration, to evaluate <br />whelher earthwork and foundation construction aclivities comply with the general intent of the <br />recommendalions presented in ihis report, and to provid�s suggestions for design changes in the <br />event subsur(ace conditions differ from those anticipated prior to the start o( construction. <br />However, our work would not include the supervision or direction of the aclual work of the <br />contractor and its empioyees or agents. Also, job and site safety, and dimensional measurements, <br />will be the responsibility of the contractor. <br />During the construction phase, �ve will provide geotechnical observation and testing services when <br />requested by you or your representatives. Please be aevare that we can only document site work <br />we actualiy observe. It is stili the responsibility o( your contractor or on-site construction team to <br />verify that our recommendations are being followed, �vhelher we are present at the site or not. <br />The scope of our work did not include an environmental assessment, but we can provide this <br />service, if requested. <br />The folloeving plates are attached to complete this report: <br />Plate 1 Vicinity Map <br />Plate 2 Site Exploration Pian <br />Plates 3- 8 Test Boring Logs <br />Plate 9 Typical Footing Drain Detail <br />We appreciate lhe opportunity to be o( service on this projecl. i( you have any questions, or if ���e <br />may be o` further service, please do nol hesilate lo contacl us. <br />DRW: jyb <br />Respectfutly submitted, <br />Principal <br />G[OTcCH CONSULTANTS. IF:C <br />iANTS. INC. <br />�b�� 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.