My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019/01/30 Council Agenda Packet
>
Council Agenda Packets
>
2019
>
2019/01/30 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 9:33:00 AM
Creation date
2/14/2019 9:32:25 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/30/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> EVERETT CITY COUNCIL AGENDA i 1'EM COVER SHEET 6 <br /> PROJECT TITLE: <br /> Change Order No. 3 with Briefing COUNCIL BILL# <br /> Interwest Construction Inc. Proposed Action Originating Department Public Works <br /> (ICI)for the Wetmore Avenue Consent Contact Person Keith Alewine <br /> Stormwater Action Phone Number (425) 257-7225 <br /> Bypass Project. First Reading FOR AGENDA OF January 30, <br /> 2019 <br /> Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department read <br /> Admini strati•n <br /> Council Press• i ,un <br /> Location Preceding Action Attachments Departments)Approval <br /> 35th St-Oakes to Change Order No. 2 Change Order#3 Public Works <br /> Wetmore 12/19/2018 <br /> Amount Budgeted $900,000.00 <br /> Expenditure Required $9,660.00 Account Number(s): UP-3704 <br /> Budget Remaining $44,041.50 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: This project provided.approximately 640 linear feet of 30-inch <br /> diameter combined sewer main and other such appurtenances on 35th Street,between Oakes and Wetmore <br /> Avenue. This project was necessary to alleviate basement flooding, due to the combined sewer/drainage <br /> system backing up into homes during excessive rain events,known as"Micro Bursts"because of lack of <br /> capacity in the existing pipes on 35th Street and its arterials. <br /> Change Order No. 3 modifies two (2)existing bid items to pay for additional work to complete the project as <br /> follows: <br /> • Modify Bid Item#A-2: Traffic Control Labor to pay for quantity overruns. <br /> • Modify Bid Item#A-29: Topsoil and Seeding to pay for quantity overruns. <br /> RECOMMENDATION(Exact action requested of Council): Authorize the Mayor to sign Change Order <br /> No. 3 with ICI for the Wetmore Avenue Stormwater Bypass Project, in the amount of$9,660.00. <br /> There is no change to the Contract time. <br /> • <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.