Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION P-PROPOSAL <br /> CITY OF EVERETT,WASHINGTON <br /> 1 PROJECT TITLE <br /> WORK ORDER#UP3398 <br /> , <br /> I To the City Council <br /> Everett, Washington <br /> The undersigned Bidder declares that he has carefully examined the Plans and Specifications, <br /> Notice to Contractors, Standard Specifications, Special Provisions, Appendix, Proposal, and <br /> Contract for the construction of a new pipe conveyance system to separate, collect, and treat <br /> stormwater from existing combined sewer system; rehabilitate and replace existing combined <br /> I <br /> sewer collection systems; and street/sidewalk restoration. Project involves construction of <br /> approximately 6,000 LF of new storm drainage pipe (6-inch to 24-inch dia.) with approximately <br /> 61 catch basin and manhole structures and approximately 10 water quality treatment structures. <br /> I Construction of approximately 5,300 LF of existing combined sewer replacements (8-inch to 12- <br /> inch dia.)with approximately 32 manhole structures(48-inch to 72-inch)and reconnection of 108 <br /> existing side sewers; asphalt street restoration; curb, gutter, sidewalk, and curb ramp <br /> reconstruction; and other such appurtenances and other such Work as may be necessary, in <br /> I accordance with the Specifications, as shown on the Plans. The undersigned declares that he has <br /> made such investigations as are necessary to determine the conditions to be encountered, and that, <br /> if this Proposal is accepted, he will enter into a contract with the City of Everett, Washington, in <br /> the form of Contract hereto annexed, he will, to the extent required, provide the necessary <br /> I equipment, tools, apparatus, and other means of construction, and he will furnish all labor and <br /> materials necessary to complete the Work in the manner herein specified and according to the <br /> requirements of the Engineer. <br /> 1 The undersigned Bidder certifies that this Proposal is in all respects fair and is made without <br /> collusion on the part of any person, firm or corporation mentioned below, and no officer or <br /> employee of the City of Everett is personally or financially interested,directly or indirectly, in the <br /> I Proposal or in any purchase of or sale of any materials or supplies for the Work to which it relates, <br /> or any portion of the profits thereof. <br /> The undersigned Bidder agrees that he will complete the Work in all respects as required by <br /> I Division C, Article 2. Time for Completion and that he will pay liquidated damages to the City <br /> in the amount specified in the Contract. <br /> Accompanying this Proposal is a bid bond or certified check in the amount of five percent(5%)of <br /> I <br /> the Proposal according to the conditions of the"Notice to Contractors"and"Division 1 —General <br /> Requirements" hereby attached. If this Proposal shall be accepted by the City of Everett, <br /> Washington, and the undersigned shall fail to execute a satisfactory contract and bond,as stated in <br /> I the Division 1 — General Requirements hereto attached, within 14 calendar days after the Award <br /> Date,then the City may, at its option, determine that the undersigned has abandoned the Contract <br /> and thereupon this Contract shall be null and void and the amount of the bid bond or certified <br /> check accompanying this Proposal shall be forfeited and become the property of the City of <br /> IEverett, Washington. <br /> I <br /> I Cleveland Avenue Division P—PROPOSAL November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> WO No.UP3398 SP-3 <br /> ilrovided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />